BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Site work and paving for a mixed-use development in Palm Desert, California. Design plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of May 28, 2025, this project is in the design phase. It should be advertised for bid around July of this year. *Previous solicitation listed below for reference:* CVWD's Engineering Department is requesting formal proposals from Respondents to prepare final plans, specifications, and cost estimates for the Valley View Trunk Sewer Design (Project). The Project work scope includes utility research, survey, potholing, right-of-way research and acquisition of necessary pipeline easements, fee title and temporary construction easements (TCE) if applicable (including preparation of legal descriptions and plats), geotechnical services, identification of alternatives and preferred pipeline alignments, final design documents, specifications, cost estimates, and permits for: 1. Proposed offsite improvements include a new sewer lift station (750 gpm firm capacity), 1,250 linear feet of 6-inch forcemain, 14,200 linear feet of 8-inch and 1,420 linear feet of 10-inch diameter gravity sewer pipeline along portions of Soto Street, Airport Blvd. The 6-inch forcemain will connect to CVWD's existing 10-inch gravity sewer pipeline at the intersection of Grapefruit and Avenue 57. This system is expected to include 44 manholes. Please refer to the attached exhibit for the project limits. 2. A new sewage lift station would be constructed at the southwest parcel of Desert Cactus Drive and Avenue 57th. From there 1,250 linear feet of 6-inch diameter force main would be constructed to the connection point on Grapefruit Blvd and Avenue 57. The design effort needs to include onsite improvements and laterals needed to convey flows from Desert View Mobile Home Park, Magdaleno Lopez Mobile Home Park, Campos Mobile Home Park, Meza's Ranch, Rodriguez' Ranch, Villa De Josue Mobile Home Park. Valley View Mobile Home Park, Leon Housing, Durans Farms, Oscar Cruz Water System, Luciano Valenzuela, Vista Norte Estates, De Leon Ranch, and Soto Water to the offsite sewer main. Approximately 6,175 feet of onsite pipelines for these 14 mobile home park to connect to the offsite sewer system. Onsite improvements also includes abandonment of 28 septic tanks. Please refer to the attached exhibit for the project limits. Q&A Deadline 04/19/2024 4:00 PM (PDT) Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Start/Delivery Date Anticipated Start Date of May 15, 2024 Project Duration Anticipated Completion Date of June 30, 2025 License Requirements Civil Engineering / Professional Engineering The method of Contractor Selection has not been Determined at this time.

Design

Water / Sewer

$500,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
303
Active Projects
132
Bidding Soon
1,449
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

Project location map

Multiple Locations, Palm Desert, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.