BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2024 at 8:00 PM

Updated June 21, 2024

Site work and paving for a road / highway in Springville, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

County: Utah Concept: TIF - Transportation Investment Fund This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This is a P+t (Price + Time) Project. Mdbc Files/models Provided on Project Explorer. The Department Will Not Hold Retention on This Project. Per Utah State Code as 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code as 13-8-5 (1) for More Information. The principal items of work are as follows (for all items of work see attachment): Borrow Structural Steel Est. Lump Qty: 717,580 lb Traffic Control Wage Rates: Apply Engineer's Estimate: Greater Than $50m but Less Than or Equal $60m Mandatory Prequalification Required (Qualified Health Insurance Required) Each bidder must submit an electronic bid bond from an approved surety company using udot's bidding Business system or in lieu thereof, cash, certified check, or cashier's check for not less than 5% of the total amount Of the bid, made payable to the Utah department of transportation, showing evidence of good faith and a guarantee That if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. The right to reject any or all bids is reserved. Mandatory Pre-bid Conference 24-APR-24 01:00:00 PM Udot Region Three - 658 N 1500 W Orem, Ut 84057 Conference Rooms a, B and C - in Person Attendance Only Conference attendance is a requirement for bid submission. UTDOT - Springville 1600 S./2700 N, S.F.Main St. to SR-51 TIF - Transportation Investment Fund *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (2.4%), WBE (6.9%), DBE (7%) Substantial completion must be reached by November 15, 2026

Award

Roads / Highways

$50,027,034.00

Public - State/Provincial

Paving, Site Work

142

5

8

12

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
77
Bidding Soon
953
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

July 22, 2024

Project location map

1600 S, Springville, UT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.