BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Rialto, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Elementary School Asphalt Replacement. Contractor commences Work: May 15, 2024 , Contractor completes Work: December 31, 2024 A copy of the applicable rates of Prevailing Wages will be on file and available for review at the Place for Submitting Bids, and a copy will be posted at the Project Site. The Project is subject to compliance monitoring and enforcement by the DIR. The successful bidder will be required to post all job-site notices required by DIR regulations and other applicable law. If so specified in the Special Provisions, the District will conduct a mandatory conference for the purpose of describing labor-law requirements. SCOPE OF WORK I. SCOPE OF WORK: a. The asphalt is a replacement of the existing asphalt surface. Construction includes but is not necessarily limited to grinding or removal of existing asphalt concrete pavement, stockpile of existing aggregate base materials, asphalt surfacing materials, placement of aggregate base and asphalt concrete, seal coat of all asphalt surfaces, crack repair and pavement markings. b. Contractor shall provide the removal of existing soil, regrading and replacement of asphalt concrete paving. c. All native ground with no subgrade needs to be graded to 4" and add subgrade material, seal coat and restripe all lines and symbols (as applicable) including, among others, ADA markings. i. Contractor shall provide temporary stripping between the installation of new asphalt and the final seal coat. ii. Contractor shall repaint and match all existing markings and parking stalls. conference initially will commence at Trapp Elementary School located at 2750 Riverside Ave, Rialto, CA 92377. Potential bidders shall meet in front of the administration building. Attendance at the pre-bid conference and site visit is mandatory, and any bidder that does not attend shall be deemed non-responsive. The District shall reject any withdrawal and superseding bid that is not received by the District prior to the Bid Deadline. The Estimate for this Project is 1 million to 1.5 million. The project duration is 230 calendar days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Sidewalks / Parking Lot

$3,489,000.00

Public - City

Paving, Site Work

7

3

6

4

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
90
Bidding Soon
2,168
All Active Projects
974
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2024

June 14, 2024

img_map_placeholder

2750 Riverside Ave, Rialto, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.