BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Colorado Springs, Colorado. Completed plans call for site work for a municipal facility.

Reference Number 0000347823 Job Location: Colorado Springs, CO Please email any questions to Kelly Valdez, Strategic Sourcing Supervisor, Colorado Springs Utilities, kvaldez@csu.org or call 719-668-7359. Colorado Springs Utilities (Utilities) is requesting proposals from qualified Respondents with demonstrated experience in installing aerial and underground armored fiber optic cables on GEP Smart. This Sourcing Event is for the construction and installation of Network Fiber Construction Services in up to and including ten (10) Fiber Hut Regions (FHRs) within and around Colorado Springs Utilities service territory. See attached instructions for registering to view the Sourcing Event documents. Proposed Start Date: 8/16/24 Expected Completion Date: 3/16/28 Scope. 3.1.The defined (fiber) architecture for this Project is primarily Gigabit Passive Optical Network (GPON): an all-passive network from a FH to the MST with unsplit and split fibers designated throughout. 3.2.As part of this Project, Contractor will expand Utilities existing fiber network by managing and constructing the Network Fiber across, up to and including ten (10) different FHRs within and around Utilities’ service territory that exist as of the effective date of this Contract. The Network Fiber begins at the zero vaults located at each FH and ends at the MST locations. Contractor will be responsible for ensuring all aspects of the Contract are met, including but not limited to schedule, quality, adhering to local, state, and federal regulations, and staffing, including management of subcontractors, all of which will be managed by the Contractor to mitigate the risks of the Work. 3.3.Contractor shall splice in accordance with Attachment A5 – Colorado Springs Utilities Fiber Splicing and Connections Quality Control Standards, and Section 4.4 of this Exhibit A. Utilities reserves the right to perform splicing upon written notification to Contractor. Utilities anticipates that it will be responsible for acceptance testing; however, Utilities reserves the right to request that Contractor perform acceptance testing pursuant to a Work Change Directive issued by Utilities’ Representative, which such Work Change Directive will be included in a Change Order in accordance with the Contract requirements for changes in Work.

Post-Bid

Municipal

$245,000.00

Public - City

Site Work

11

6

6

6

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
30
Bidding Soon
665
All Active Projects
284
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2024

August 16, 2024

img_map_placeholder

Multiple Locations, Colorado Springs, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.