BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a transportation facility in Orlando, Florida. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

The time of completion for this Work is anticipated to be 275 calendar days to achieve Substantial Completion; exact time requirements are defined in the Instructions to Bidders. The objection of this project is to provide the construction for the rehabilitation of Taxiways G and H, and Taxiway Connectors H6 through H10, located in the East Airfield, west of Runway 17R-35L. The construction work includes improvements to the taxiway pavement geometry and taxiway safety areas for compliance with the FAA current standards, Concrete and asphalt pavement removal, mill and overlay of existing asphalt shoulder pavement, resealing joints and replacing cracked concrete slabs, related improvements for taxiway markings, and improvements to the airfield lighting and signage A Bid Security in the amount of ten percent (10%) of the sum of the Total Bid Price will be required for this Project. Exact Bid Guarantee period requirements are defined in the Instructions to Bidders. All Bidders are hereby notified that they must comply with: (1) the Disadvantaged Business Enterprise (DBE) requirements of 49 CFR Part 26, as referenced in the Owners Disadvantaged Business Enterprise Participation Program and Affirmative Action requirements; (2) the Buy American requirements imposed by 49 USC 50101; (3) the minimum prevailing wage rates established by the Secretary of the U.S. Department of Labor (Davis Bacon requirements); (4) Certification Regarding Lobbying Pursuant to 49 CFR Part 20 for Contracts, Grants, Loans, and Cooperative Agreements; (5) Certification Regarding Debarment, Suspension, Ineligibility And Voluntary Exclusion (2 CFR Part 1200,2 CFR Part 180, and the Owners Policy Section 130.04); (6) the Standard Title VI Assurances and Nondiscrimination Provisions; (7) the Foreign Trade Restriction Certification (49 USC 50104 and 49 CFR part 30); and, (8) the procurement of recovered materials pursuant to the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, and the regulatory provisions of 40 CFR Part 247. The requirements of 49 CFR part 26 apply to this Contract. It is the policy of the Owner to practice nondiscrimination based on race, color, sex or national origin in the award or performance of this Contract. The Owner encourages participation by all firms qualifying under this solicitation regardless of business size or ownership. The Offerors or Bidders attention is called to the Equal Opportunity Clause and the Standard Federal Equal Employment Opportunity Construction Contract Specifications set forth herein. 2. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractors aggregate work force in each trade on all construction work in the covered area are as follows: Timetables: Goals for minority participation for each trade: 15.5% Goals for female participation in each trade: 6.9% These goals are applicable to all of the Contractors construction work (whether or not it is federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its federally involved and non-federally involved construction. The Contractors compliance with the Executive Order and the regulations in 41 CFR Part 604 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 604.3(a), and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the Contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project, for the sole purpose of meeting the Contractors goals, shall be a violation of the Contract, the Executive Order, and the regulations in 41 CFR Part 604. Compliance with the goals will be measured against the total work hours performed. 3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within ten (10) working days of award of any construction subcontract in excess of Ten Thousand Dollars ($10,000.00) at any tier for construction work under the Contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the Subcontractor; employer identification number of the Subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed. 4. As used in this notice and in the Contract resulting from this solicitation, the covered area is Orlando, Florida SMSA Orange, Osceola, and Seminole Counties, Florida. The Owners award of this Contract is conditioned upon the Bidder satisfying the good faith effort requirements of 49 CFR 26.53. The DBE requirements are set forth in General Provisions Section 20-28 of this Solicitation. The DBE Participation Goal for this Contract is 12%. Site visit info: Without proper identification, Bidders will not be allowed to be escorted on the airfield.

Post-Bid

Transportation Terminals

$2,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
156
Bidding Soon
2,650
All Active Projects
1,087
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 30, 2024

July 1, 2024

April 2, 2025

img_map_placeholder

1 Jeff Fuqua Blvd, Orlando, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.