BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2024 at 8:00 PM

Updated June 13, 2024

Site work and paving for a mixed-use development in Greenwood, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of June 12, 2024, project was awarded to Orr Wyatt Streetscapes awarded amount is $198,437.90.** The project is the Sidewalk and Curb Maintenance Project. The work generally consists of concrete pavement removal and replacement, sidewalk concrete lifting, asphalt patching, subgrade preparation, maintenance of traffic, and erosion control. Direct all questions to Justin Likes, TREKK Design (jlikes@trekkllc.com) Plans, specifications, proposal forms, and contract documents may be seen at the office of the City Clerk, Greenwood City Hall, 709 West Main Street, Greenwood, Missouri 64034.

Award

Sidewalks / Parking Lot

$198,438.00

Public - City

Paving, Site Work

4

12

2

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
95
Bidding Soon
1,087
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

May 20, 2024

Project location map

Multiple Locations, Greenwood, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.