BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 21, 2025

Site work and paving for a bridge / tunnel in Fort Wayne, Indiana. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of November 20, 2025, this project is in the design phase. Bidding will take place September, 12th, 2029. Construction is expected to begin November 2029. *The closed solicitation has been included below for reference: Title: Allen County PE and RW Services for the Ferguson Road Bridge 404 (Des # 2301666) in the Fort Wayne District. This Request for Proposals (R.FP) is official notification of needed professional services. This RFP is being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal aid projects. A submittal does not guarantee the firm will be contracted to perform any services but only serves notice the firm desires to be considered. Local Public Agency: Board of Commissioners of the County of Allen, Indiana Project Location: Ferguson Road Bridge #404 over the St Marys River Project Description:Allen County is seeking a consultant to provide design and ROW services for the rehabilitation of Allen County Bridge #404, including removal of the existing bridge decks and bridge railing; converting end-bents to semi-integral; and link slabs to eliminate open expansion joints over the piers; and installation of new thinker deck to replace the substandard existing deck, crash-tested bridge railing, and approach railing. The use of lightweight concrete should be considered due to substandard existing deck thickness and to avoid overstressing the existing beams and hammerhead piers when the new deck and barrier rail are constructed. INDOT Des #: 2301666 Phases Included: PE and RW Estimated Construction Amount: $8,300,000 Funding: Federal Funding Involved Term of Contract: Until Project Completion DBE goal: 5% Contact for Questions: Bill Hartman, Highway Department Director 200 E. Berry Street, Suite #280 Fort Wayne, Indiana 46802 (260) 449-7369 bill.hartman@co.allen.in.us INDOT - RFP Engineering - Allen County PE and RW Services for the Ferguson Road Bridge 404

Design

Bridges / Tunnels

$9,800,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
132
Bidding Soon
1,231
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2029

November 12, 2029

Project location map

W Ferguson Rd, Fort Wayne, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.