Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 20, 2025 at 7:00 PM
Updated November 21, 2025
Site work and paving for a bridge / tunnel in Fort Wayne, Indiana. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of November 20, 2025, this project is in the design phase. Bidding will take place September, 12th, 2029. Construction is expected to begin November 2029. *The closed solicitation has been included below for reference: Title: Allen County PE and RW Services for the Ferguson Road Bridge 404 (Des # 2301666) in the Fort Wayne District. This Request for Proposals (R.FP) is official notification of needed professional services. This RFP is being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal aid projects. A submittal does not guarantee the firm will be contracted to perform any services but only serves notice the firm desires to be considered. Local Public Agency: Board of Commissioners of the County of Allen, Indiana Project Location: Ferguson Road Bridge #404 over the St Marys River Project Description:Allen County is seeking a consultant to provide design and ROW services for the rehabilitation of Allen County Bridge #404, including removal of the existing bridge decks and bridge railing; converting end-bents to semi-integral; and link slabs to eliminate open expansion joints over the piers; and installation of new thinker deck to replace the substandard existing deck, crash-tested bridge railing, and approach railing. The use of lightweight concrete should be considered due to substandard existing deck thickness and to avoid overstressing the existing beams and hammerhead piers when the new deck and barrier rail are constructed. INDOT Des #: 2301666 Phases Included: PE and RW Estimated Construction Amount: $8,300,000 Funding: Federal Funding Involved Term of Contract: Until Project Completion DBE goal: 5% Contact for Questions: Bill Hartman, Highway Department Director 200 E. Berry Street, Suite #280 Fort Wayne, Indiana 46802 (260) 449-7369 bill.hartman@co.allen.in.us INDOT - RFP Engineering - Allen County PE and RW Services for the Ferguson Road Bridge 404
Design
Bridges / Tunnels
$9,800,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 12, 2029
November 12, 2029
W Ferguson Rd, Fort Wayne, IN
Related To This Project
Fort Wayne, IN
Bid Date: Apr 18 2024
Fort Wayne, IN
Bid Date: Apr 10 2024
Fort Wayne, IN
Bid Date: Apr 24 2024
Fort Wayne, IN
--
Fort Wayne, IN
Bid Date: Apr 25 2024
Fort Wayne, IN
Bid Date: Apr 18 2024
Fort Wayne, IN
Bid Date: Apr 23 2024
Fort Wayne, IN
Bid Date: Apr 23 2024
Fort Wayne, IN
Bid Date: Apr 04 2024
Fort Wayne, IN
Bid Date: Apr 04 2024
Fort Wayne, IN
--
Fort Wayne, IN
--
Fort Wayne, IN
--
Fort Wayne, IN
--
Fort Wayne, IN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
