Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 26, 2024 at 8:00 PM

Updated April 27, 2024

Site work, new construction and renovation of a playground / park / athletic field in Saint Joseph, Missouri. Completed plans call for the construction of a playground / park / athletic field; for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

The work will generally consist of replacing existing restrooms at Hyde, Corby, and Hochman Parks and adding a new restroom at Northeast Park as specified in the bidding documents. Please pay close attention to State Prevailing Wage Determination and OSHA Safety Training requirement per R.S.Mo 292.675 The City reserves the right to accept or reject any or all bids. The City of St. Joseph is an Equal Opportunity Employer.

Post-Bid

Playgrounds / Parks / Athletic Fields

$220,000.00

Public - City

New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
86
Bidding Soon
1,291
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

May 27, 2024

Project location map

Multiple Locations, Saint Joseph, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed