BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 28, 2024 at 8:00 PM

Updated July 4, 2024

Site work and paving for a sidewalk / parking lot in Folcroft, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Borough of Folcroft is performing driveway entrance improvements at Montgomery Park. At present, the existing timber retaining wall that runs the length of the driveway along Muckinipattis Creek is in very poor condition and requires immediate replacement. This project aims to replace the existing retaining wall with a cast-in-place concrete wall, replace the existing chain link fence with a wooden privacy fence, install a new guide rail, and rehabilitate the existing driveway pavement Questions Due Date: Jun 27th 2024, 5:00 PM EDT

Post-Bid

Sidewalks / Parking Lot

$481,370.00

Public - City

Paving, Site Work

12

18

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
844
Active Projects
458
Bidding Soon
5,844
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2024

August 2, 2024

Project location map

930 Taylor Dr, Folcroft, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.