BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Bemidji, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; water / sewer project; and sidewalk / parking lot.

Description: Remove Curb and Gutter 2582 LF; Remove Bituminous Pavement 6664 SY; Remove Concrete Walk 13775 SF; Aggregate Base Class 5 - 2897 Ton; Type SP 12.5 Bituminous 1285 Ton; Concrete Curb & Gutter B618 - 2642 LF; 4" Concrete Walk 5470 LF; 6" Concrete Walk 10503 SF; 6" Concrete Pavement 174 SY; Turf Establishment 1 Lump Sum; 12"-15" RC Pipe Sewer Class III 138 LF; Connect to Existing Storm Sewer 2 each; Const Drainage Structure Design H 9.1 LF; Const Drainage Structure Design F 10 LF; 8" PVC Pipe Sewer 25 LF; Const Drainage Structure Design F 24.9 LF; 8" Watermain Ductile Iron 828 LF; 4" Solid Line Paint - 2157 LF; 4" Double Solid Line Paint 218 LF. Site Address: 15th Street NW Bemidji Beltrami MN Est. Completion Date: Oct. 4, 2024 Est. Value Notes: $650,000 - $750,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Description This work shall consist of furnishing and installing two (2 inch) thick insulation board above possible freezing locations caused by cover depth and or pipe crossings. Locations shall be as designated in the plan together with locations to be designated by the engineer in the field. This work shall be performed in accordance with the details shown in the Plans, the applicable Mn/DOT Standard Specifications, and the following: 1. The insulation board shall be rigid extruded polystyrene conforming to the material requirements of Mn/DOT 3760. Styrofoam S.M. and Styrofoam TG brand insulation is an approved insulation material. 2. The insulation material shall be furnished in panels (2 inch) thick and shall be placed on a smooth level foundation a total of 4 inches thick; staggered manner that will provide joint overlaps a minimum of 6 inches on the underlying sheets and the edges shall be trim and square. 3. In locations of insulating existing utility services, 4" insulation pay item shall include costs associated with excavation to within 1-2 feet from top of existing utility services and backfilling to top of subgrade.

Award

Roads / Highways

$761,728.00

Public - City

Paving, Site Work

43

13

5

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
3
Bidding Soon
50
All Active Projects
28
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

July 8, 2024

img_map_placeholder

15th St NW, Bemidji, MN

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.