BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 24, 2024 at 8:00 PM

Updated May 25, 2024

Site work for a civil project in Elk Grove, California. Completed plans call for site work for a water / sewer project.

Sac Sewer (Echo Water) operates the Echo Water Resource Recovery Facility in Elk Grove, CA. Sac Sewer also owns the historic Nicolaus Dairy farm property which has undergone significant restoration efforts in the past few years. This project will install a new metered potable waterline to provide the Nicolaus Dairy farm with a potable water supply to feed existing onsite infrastructure. Time is of the essence. Damages and expenses will be sustained by District if the Work is not completed within the Contract Time or by the Contract Milestone Completion Date listed in the table above. It is agreed that the liquidated damages are reasonable compensation to Sac Sewer (Echo Water) if the Work or Work Items are not completed within the specified times. Liquidated damages are additive and cumulative for each day that the Work or Work Item is not completed. Liquidated damages will be assessed against payments due under Contract. Bid bond/deposit not less than ten (10) percent of the aggregate total bid is required to be submitted with the sealed bid Sac Sewer (Echo Water) reserves the right to reject any or all bids and waive any irregularity in bids received. Intent to Award: April 30, 2024 Vet Bonds May 15, 2024 Provide Required Insurance and Bonds May 14, 2024 DIR Registration Due: April 22, 2024 : Bids from Contractors not registered on the Department of Industrial Relations website by this date, will not be opened. Award will be made to the lowest responsible bidder. Contract Award: May 7, 2024 Project Completion: 30 CALENDAR days after notice to proceed Question Deadline 04/15/2024 at 3:00 PM PT Questions regarding this RFB and questions regarding drawings and specifications shall be referred to: Evelyn Trinh Project Engineer (916) 875-9204 trinhe@sacsewer.com Sac Sewer (Echo Water) reserves the right to reject any or all bids and waive any irregularity in bids received. ENGINEER'S ESTIMATE: $165,000 Successful Bidder must furnish a 100 percent Performance Bond and Payment Bond per Appendix E and Appendix D respectively.

Award

Water / Sewer

$170,420.00

Public - City

Site Work

11

13

16

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
498
Active Projects
212
Bidding Soon
2,909
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

May 23, 2024

Project location map

8521 Laguna Station Rd, Elk Grove, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.