Site work for a water / sewer project in Plantation, Florida. Working plans call for site work for a water / sewer project.
As of April 24, 2024, an engineer has been selected and this project is in the final phase. It is anticipated construction will start in in 2025. The project is include in the city's 2024-2028 Capital Improvement Program (CIP). Design firm information has not been determined. The Sawgrass Wastewater Treatment Plant (WWTP) is a conventional activated sludge treatment facility which is divided into two parallel/separate secondary treatment systems comprised of two train systems, referred to as Train A (old) and Train B (new). Train A was originally constructed in two phases and completed circa 1987 & 1989, respectively. The multi-stage centrifugal blowers and the electrical equipment for the original Train A treatment system are reaching the end of their useful life. This equipment is housed in Blower Building 1, which is a pre-engineered metal building constructed in 1987 that clearly shows signs of deterioration and age. The purpose of this design project is to replace the equipment located in Blower Building 1 by constructing a new building adjacent to the existing Blower Building 1, and demolishing the existing building once the new process and electrical services have been made operational. The replacement of the Train A aeration process equipment also allows modifications to the Train A Aeration Basins to be made. These modifications will eliminate the existing Surge Tanks, by incorporating them into the aeration basins, as well as the large Dosing Pumps, which have also reached the end of their useful lives. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Water / Sewer
$8,700,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2024
11450 NW 8th St, Plantation, FL
Related To This Project
Plantation, FL
Bid Date: May 13 2024
Plantation, FL
Bid Date: May 10 2024
Plantation, FL
--
Plantation, FL
Bid Date: May 21 2024
Plantation, FL
--
Plantation, FL
Bid Date: Sep 10 2024
Plantation, FL
Bid Date: Jun 21 2024
Plantation, FL
--
Plantation, FL
Bid Date: Apr 16 2024
Plantation, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.