BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Plantation, Florida. Working plans call for site work for a water / sewer project.

As of April 24, 2024, an engineer has been selected and this project is in the final phase. It is anticipated construction will start in in 2025. The project is include in the city's 2024-2028 Capital Improvement Program (CIP). Design firm information has not been determined. The Sawgrass Wastewater Treatment Plant (WWTP) is a conventional activated sludge treatment facility which is divided into two parallel/separate secondary treatment systems comprised of two train systems, referred to as Train A (old) and Train B (new). Train A was originally constructed in two phases and completed circa 1987 & 1989, respectively. The multi-stage centrifugal blowers and the electrical equipment for the original Train A treatment system are reaching the end of their useful life. This equipment is housed in Blower Building 1, which is a pre-engineered metal building constructed in 1987 that clearly shows signs of deterioration and age. The purpose of this design project is to replace the equipment located in Blower Building 1 by constructing a new building adjacent to the existing Blower Building 1, and demolishing the existing building once the new process and electrical services have been made operational. The replacement of the Train A aeration process equipment also allows modifications to the Train A Aeration Basins to be made. These modifications will eliminate the existing Surge Tanks, by incorporating them into the aeration basins, as well as the large Dosing Pumps, which have also reached the end of their useful lives. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Water / Sewer

$8,700,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
50
Bidding Soon
1,114
All Active Projects
503
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

img_map_placeholder

11450 NW 8th St, Plantation, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.