BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Gig Harbor, Washington. Completed plans call for site work for a playground / park / athletic field; for paving for a sidewalk / parking lot; playground / park / athletic field; sidewalk / parking lot; and water / sewer project.

**As of May 14, 2024, this project has not yet been awarded. A timeline for the award has not yet been established.** The Kopachuck State Park Day Use Development project consists of removal of an existing restroom building, construction of a new Day Use Building and deck, Welcome Center building, wood decks, ramps and stairs, wood amphitheater, concrete ADA accessible paths, picnic areas, play area elements, play tower structure, faux water feature, park entry gateway and sign, concrete walls, paved one-way parking lot with 98 stalls, vehicular gates, and school connector trail/pathway along south side of 56st NW. Work includes clearing, grading, concrete, asphalt, sanitary sewer, storm sewer, domestic water, electrical systems, CCTV system, and landscape planting. Bid Alternate A1: Wood Deck/Ramp & Stairs Day Use Area to Beach Trail Bid Alternate A2: Amphitheater Wood Deck, Ramp, Steps, and Seating Bid Alternate A3: Welcome Center Wood Stairs Bid Alternate A4: School connector Trail and Small Parking Lot Along 59th St NW Bid Alternate A5: Day Use to Beach Area Trails Bid Alternate A6: Use of On-Site Salvaged Wood Material for Play Tower Structure Bid Alternate A7: Use of On-Site Salvaged Wood Material for Park Entry Gate Structure Engineers Estimate: $6.65M -$7.5M Schedule: Work to be completed within 365 Calendar Days from the NTP A copy of Ohno's standard subcontract agreement is available at its office locations or upon written request. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor's obligations to Ohno in the amount of 100 percent of the bid to Ohno. Ohno will reimburse the bond premium at actual cost not to exceed 2 percent. Question Deadline 04/19/2024 at 1:00 PM PT Send questions to estimating@ohnoconstruction.com Please note that we request bids a day earlier to allow for time for questions and data input. Actual bid date is April 25th @1:00pm. Quotes are required at least 2 hours prior to bid time. Proposals received after the Bid Due Date and Time will NOT be considered. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Playgrounds / Parks / Athletic Fields

$8,694,719.00

Public - State/Provincial

Paving, Site Work

200

28

19

3

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
26
Bidding Soon
659
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

June 24, 2024

img_map_placeholder

10712 56th St NW, Gig Harbor, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.