BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Bowie, Texas. Completed plans call for site work for a water / sewer project.

Sealed bids for the unit price general construction contract for the construction of Glenn Hills Lift Station and Sludge Pump Replacement No pre-bid conference will be conducted. The OWNER reserves the right to waive any informalities or to reject any or all bids. Each BIDDER must deposit with his bid, security in the form of a certified check or bank draft, payable to the order of City of Bowie, or a satisfactory Bid Bond executed by the BIDDER of an acceptable surety in an amount equal to five percent (5%) of the total bid. All bids shall remain good and may not be withdrawn for 90 calendar days from the date of the bid opening, for the purpose of reviewing the bids and investigating the BIDDER'S qualifications prior to contract award. This contract is contingent upon release of funds from the Texas Water Development Board. Any contract or contracts awarded under this Invitation for Bids are expected to be funded in part by financial assistance from the TWDB. Neither the U.S. Environmental Protection Agency (EPA) or the State of Texas, nor any of its departments, agencies, or employees are or will be a party to this Invitation for Bids or any resulting contract. Wages to be paid on this project will be governed by the Department of Labor (DOL) Wage General Decision or Decisions are included within the bid documents for this project. All Davis-Bacon Act conditions shall be followed. The contract will also be subject to monitoring and reporting requirements described in the bid documents. All laborers and mechanics working on the work site and employed by CONTRACTORS and subcontractors on projects funded directly by or assisted in whole or in part by and through the Clean Water State Revolving Fund shall be paid wages as described in the section, Mandatory Davis-Bacon Act Contract Conditions. For prime contracts in excess of $100,000, Contractors and Subcontractors must also, under the provisions of the Contract Work Hours and Safety Standards Act, as amended, pay laborers and mechanics, including guards and watchmen, at least one and one-half times their regular rate of pay for all hours worked over 40 in a workweek. The Fair Labor Standards Act may also apply to Davis-Bacon covered contracts. Any contracts or subcontracts in excess of $2,000 must include the provisions of the Davis-Bacon Wage Rate Requirements found in TWDB Guidance No. DB-0156. This project is subject to the American Iron and Steel (AIS) requirements of Public Law 114-113, Consolidated Appropriations Act, 2016, or subsequent appropriations acts, for Clean Water State Revolving Fund or Drinking Water State Revolving Fund projects. Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of these laws. Equal Opportunity in Employment - All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability or genetic information. Bidders on this work will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors-- Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. The City is an Affirmative Action/Equal Opportunity Employer; Small, minority, and women owned businesses are encouraged to submit bids for this project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$750,000.00

Public - City

Site Work

7

13

2

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
75
Bidding Soon
3,254
All Active Projects
1,185
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

May 24, 2024

img_map_placeholder

To Be Determined, Bowie, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.