BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 11, 2024 at 8:00 PM

Updated July 12, 2024

Renovation of a multi-residential development in New Bedford, Massachusetts. Completed plans call for the renovation of a multi-residential development.

Fence Replacement at Presidential Heights Development located at 159 Fillmore Street in New Bedford, Massachusetts The Project consists of: furnishing and installing all materials, labor, equipment, supervision and incidentals required for the installation of erosion control measures; removal and disposal of tree roots or stumps; removal and disposal of existing chain link fencing with concrete foundations; filling in post holes on existing retaining wall; disposal of excavated material; protection of work; loam and seed areas; new concrete fence foundations, and the furnish and install 5 ft. high Black High Industrial Ornamental Steel Fencing along Mount Pleasant Street and Myrtle Street at the New Bedford Housing Authority Presidential Heights Development and associated site work as specified within the contract documents. MINORITY BUSINESS ENTERPRISES (MBEs) The overall minimum goal for the utilization of SDO (Supplier Diversity Office) Certified MINORITY BUSINESS ENTERPRISES to be achieved on all contracts shall be twelve percent (12%) of the total value of the contract award. WOMEN BUSINESS ENTERPRISES (WBEs) The overall minimum goal for the utilization of SDO certified WOMEN BUSINESS ENTERPRISES to be achieved on all contract shall be five percent (5%) of the total value of the contract award. Question Deadline 05/20/2024 at 12:00 PM ET Contractor questions will be received, Any questions received after the deadline will not be considered or answered

Award

Multi-Residential

$202,338.00

Public - City

Renovation

9

21

5

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
468
Active Projects
182
Bidding Soon
3,432
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

August 12, 2024

Project location map

159 Fillmore St, New Bedford, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.