BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2024 at 8:00 PM

Updated June 14, 2024

Site work and paving for a mixed-use development in Greeley, Colorado. Completed plans call for site work for a road / highway; sidewalk / parking lot; and for paving for a road / highway.

As of June 13, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. Reference Number 0000348248 Question Deadline 04/18/2024 at 2:00 PM MT Questions are submitted online No, Questions pertaining to the project may be directed to purchasing@greeleygov.com This is a lump sum bid item includes the traffic signal work and ADA ramp/sidewalk reconstruction. The traffic signal work includes all work and materials necessary to upgrade and operate traffic signals at the 11th Avenue & 5th Street, 11th Avenue & 25th Street, and 11th Avenue & 26th Street intersections. This work also includes installing signal equipment such as hand holes, traffic signal cabinets, wiring, push buttons, signal heads and other equipment indicated on plans provided in Appendix B, C, and D. The work specified below describes the installation of necessary material and equipment to complete traffic signal installations and/or electrical systems. All materials and labor shall be included in the base bid cost except for City furnished materials listed below. Incidental work includes performing traffic control, locates, and other associated work. The traffic signal work, sidewalk, and ADA ramp construction is located at these three locations: 11th Avenue & 5th Street 11th Avenue & 25th Street, and 11th Avenue & 26th Street intersections. This is a lump sum bid item includes the traffic signal work and ADA ramp/sidewalk reconstruction. The traffic signal work includes all work and materials necessary to upgrade and operate traffic signals at the 11 th Avenue & 5 th Street, 11 th Avenue & 25 th Street, and 11 th Avenue & 26 th Street intersections. This work also includes installing signal equipment such as hand holes, traffic signal cabinets, wiring, push buttons, signal heads and other equipment indicated on plans provided in Appendix B, C, and D. The work specified belowdescribes the installation of necessary material and equipment to complete traffic signal installations and/or electrical systems. All materials and labor shall be included in the base bid cost except for City furnished materials listed below. Incidental work includes performing traffic control, locates, and other associated work. The ADA ramp/sidewalk work includes the reconstruction of the ramps and adjacent sidewalk sections as shown on the plans. All work for this project shall be completed in accordance to the these specifications, the plans, any special provisions, and all supplemental documents including the current Colorado Department of Transportation specifications or City of Greeley specifications whichever is more stringent. The City will furnish the following items: o Video Detection Devices o Traffic Signal Heads o Pedestrian Count-down Signal Heads o Pedestrian Push Buttons o Pedestal Pole (without base) o Traffic Signal Controller Cabinet & Operating Equipment o Pull boxes o Backplates o CCTV cameras Electrical equipment shall conform to the standards of the National Electrical Manufacturers Association. Material and work shall conform to the applicable requirements of the National Electrical Code and any loc Notice of Award (tentative) 4/29/2024 Time to Complete Project is between June 1st and August 1, 2024. Each bid shall be accompanied, by a certified check drawn on a bank which is insured by the Federal Deposit Insurance corporation or a bidder's bond executed by a surety company authorized to do business in Colorado, made payable to the City of Greeley, Colorado, in an amount not less than five percent (5%) The successful responsive and responsible bidder will be required to furnish a satisfactory performance bond and payment bond in the amount of the contract sum. No bid shall be withdrawn after the opening on the bids without the consent of the City of Greeley, Colorado, for a period of sixty (60) days after the scheduled time of the receiving the bids. The City of Greeley retains the right to reject any and all bids and to waive any informality as deemed in the best interest of the city.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

1

3

27

4

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
98
Bidding Soon
1,361
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2024

June 1, 2024

Project location map

11th Ave, Greeley, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.