BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Fresno, California. Completed plans call for the renovation of a educational facility.

Wolters Elementary School Multipurpose Room and Classroom Roof Replacement, to repair and replace existing roof on Multipurpose Room and (4) Classrooms. Clarification Deadline 4/17/2024 5:00 Pm Prime Contractor must have a valid Class C-39 Contractors License. The time allowed for completion for the project shall be 45 Calendar days. Bids shall be accompanied by a certified check, cashiers check, or a bidders bond in an amount not less than ten percent (10%) of total bids made payable to Fresno Unified. The work includes, but is not limited to the following: a. Removal and disposal of existing steep-slope roofing systems where indicated in Specifications. Installation of new, steep-slope roofing systems per specifications, manufacturer and building code requirements. b. Replace damaged or defective plywood roof sheathing, diagonal sheathing and straight wood board roof decking as authorized by Owner. Contractor to provide Unit Cost for additional plywood exceeding quantities included in Base Bid. See Bid Form and Section 06 10 00 for requirements. c. Remove and replace damaged or defective 1X wood board roof decking as authorized by Owner. Install new decking to match existing thickness. Contractor to provide Unit Cost for additional lumber exceeding quantities included in Base Bid and Alternate Lump Sum Bids. See Bid form and Section 06 10 00. Install two (2) nails at each bearing point over framing. d. Remove and replace damaged or defective 2X wood board roof decking as authorized by Owner. Install new decking to match existing thickness. Contractor to provide Unit Cost for additional lumber exceeding quantities included in Base Bid and Alternate Lump Sum Bids. See Bid Form and Section 06 10 00. Install two (2) nails at each bearing point over framing. e. Remove and replace existing flashings and edge metal unless indicated otherwise. Install new sheet metal flashings at all roof penetrations and new 24 GA. G.I. perimeter metal edging to match dimensions of existing metal edging. Paint to match. f. Install new low-profile roof attic vents at all specified steep-slope roof areas per building code and local jurisdiction requirements. Install at high-low configuration to provide maximum venting. Color to complement roof and building finish. g. Remove all non-functioning service lines, flashings and related components at specified roof areas and/or as required to properly install new roofing systems. h. Temporarily support or detach wall-mounted elements as required to remove existing roofing system and to properly install new insulation and specified roofing systems and related elements. Reinstall elements on existing or new supports as indicated on Reroof of MPR & 4 Classroom Buildings Wolters Elementary School, Fresno Unified School District Fresno, California drawings. i. Disconnect and remove existing roof-mounted HVAC units, HVAC supports, roof vents, and rooftop equipment and deck penetrations as required to properly remove existing roofing and install new roofing systems in operational condition. j. All miscellaneous demolition required for proper installation of new roof systems.

Bid Results

Educational

$129,200.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
27
Bidding Soon
400
All Active Projects
156
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

July 1, 2024

img_map_placeholder

5174 N First St, Fresno, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.