BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of an educational facility in Fresno, California. Completed plans call for the construction of a educational facility.

The Contractor and all subcontractors shall furnish certified payroll records as required, pursuant to Labor Code section 1776, directly to the Labor Commissioner, in accordance with Labor Code section 1771.4 on at least a monthly basis (or more frequently if required by the District or the Labor Commissioner), and in a format prescribed by the Labor Commissioner. Monitoring and enforcement of the prevailing wage laws and related requirements will be performed by the Labor Commissioner/ Department of Labor Standards Enforcement (DLSE). No bidder may withdraw any bid for a period of 90 calendar days after the date set for the opening of bids. Each bidder's bid must be accompanied by one of the following forms of bidder's security: (1) cash, (2) a cashier's check made payable to the District, (3) a certified check made payable to the District, or (4) a bidder's bond executed by a California admitted surety, as defined in Code of Civil Procedure section 995.120, made payable to the District in the form set forth in the Contract Documents. Such bidder's security must be in an amount not less than ten percent (10%) of the maximum amount of bid as a guarantee that the bidder will enter into the proposed Contract, if the same is awarded to such bidder, and will provide the required Performance and Payment Bonds, insurance certificates, and any other required documents. In the event of failure to enter into said Contract, or provide the necessary documents, said security will be forfeited Separate payment and performance bonds, each in an amount equal to 100% of the total Contract amount, are required, and shall be provided to the District prior to execution of the Contract and shall be in the form set forth in the Contract Documents. THE SCOPE OF WORK SHALL CONSIST OF MINOR DEMOLITION OF CONCRETE WALKS AND EXISTING FENCING, SOME UNDERGROUND ELECTRICAL, GATES WITH PANIC HARDWARE, FIRE ALARM AND CONSTRUCTING IN SHOP AND PLACING/INSTALLING BUILDING 600 (A 36' X 40' MODULAR BUILDING) ON A CONCRETE FOUNDATION-PIT SET

Post-Bid

Educational

$3,000,000.00

Public - City

New Construction, Site Work

81

20

107

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
27
Bidding Soon
391
All Active Projects
170
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2024

May 20, 2024

img_map_placeholder

2025 E Teague Ave, Fresno, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.