Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2024 at 8:00 PM

Updated May 31, 2024

Site work and paving for a civil project in Carver, Minnesota. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

As of May 14, 2024 project was awarded to S.M. Hentges & Sons, Inc., awarded amount is $1,339,973.50, Description: 1 EACH Replace Existing Bridge 155 LIN FT 12" - 18" Storm Sewer Construction 130 TON Bituminous Paving 2,080 SQ FT Concrete Walk Reconstruction 260 LIN FT Concrete Curb and Gutter Reconstruction 52 LIN FT 12'x6' Precast Concrete Box Culvert 30,250 CU YD Structural Concrete

Award

Bridges / Tunnels

$1,339,974.00

Public - City

Paving, Site Work

55

21

69

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
110
Bidding Soon
1,775
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

May 23, 2024

Project location map

3rd St W, Carver, MN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed