BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Berlin Center, Ohio. Conceptual plans call for the construction of a water / sewer project; for the demolition of a water / sewer project; for site work for a water / sewer project; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.

erlin Lake Mill Creek Recreation Area - Wastewater Treatment Facility Replacement Project Berlin Lake, Mahoning County, Ohio The U.S. Army Corps of Engineers (USACE), Pittsburgh District, is carrying out a Project to replace the existing Wastewater Treatment Facility (WWTF) at the location referenced above. Work is to be performed entirely on Government property which consists of a public campground, two USACE field offices, and the existing WWTF. The campground is open annually from mid-May to mid-September, while the two USACE field offices are open year-round. The Government currently operates the existing 30,000 gallon per day (gpd) WWTF year-round and will need continuous access and utility services to do so during the Project. The new prefabricated WWTP is to be constructed adjacent to the existing WWTP. Final conversation to the new prefabricated WWTP is required prior to demolition of the existing WWTP. Major features and coordination efforts of the Project generally include, but are not limited to, the following: Installing a new, prefabricated pump station and force main line. Installing a new, prefabricated WWTF with appurtenances. The prefabricated WWTF (rated at 30,000 gpd) will utilize the extended aeration process and may have, among other features, a trash trap, flow equalization/aeration/clarifier/sludge holding/dosing tanks, fixed media and surface sand filtration, and UV disinfection. Renovating the existing WWTF control/laboratory building. Limited testing has been conducted and it is assumed that additional lead and asbestos testing/remediation may be required. Upgrading the existing power supply per local utility requirements and installation of a dedicated automatic emergency power generator. Installing gravel driveway for access and parking, lighting, and security fencing/gates. Reconfiguring portions of the existing sanitary sewer piping near the headworks and outfall manhole of the existing WWTF to accommodate the new hydraulic flow profile. Site grading, including erosion and sediment control, along with final restoration and landscaping at the WWTF. An Ohio Environmental Protection Agency (OPEA) Permit-to-Install (PTI) permit is being secured by the Government for the new WWTF and the contractor will have to comply with any OEPA requirements. Seamless switchover from the existing WWTF to the new prefabricated WWTF. Demolition and proper disposal of the existing WWTF and appurtenances. OEPA-licensed-operator startup and operation of the new WWTF for a limited duration, including training of the Government or other operators. Physical construction and demolition for the Project is currently estimated to take place from May 2025 through October 2026 and campground operations throughout the year are assumed to remain unchanged. Disposal of construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable. INTERESTED SOURCES MUST PROVIDE THE FOLLOWING INFORMATION: Interested and capable sources are requested to provide complete responses with the following information to Aaron M. Barr, Contract Specialist, no later than 5:00 PM ET on 26 April 2024 by email at Aaron.M.Barr@usace.army.mil. (1) Company/firm name and address (2) Company/firm point of contact, telephone number and email address (3) Company/firm cage code (4) Company/firm business size, to include designation as large business, small business, HUBZone, 8(a), Service Disabled Veteran Owned Small Business, Small Disadvantaged Business or Women-Owned Business. (5) All interested contractors should submit a narrative demonstrating their specialized experience in similar type contracts and past performance. Capability statements should include, bonding capacity, bonding availability, details of similar projects and the completion dates, and contract amounts for the similar projects listed. If you have any questions, please contact me. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Water / Sewer

$25,000,000.00

Public - Federal

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
179
Bidding Soon
2,701
All Active Projects
1,194
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 1, 2025

October 30, 2026

img_map_placeholder

To Be Determined, Berlin Center, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.