BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Baton Rouge, Louisiana. Completed plans call for site work for a playground / park / athletic field.

Bully Camp Field in Lafourche Parish - The Louisiana Department of Natural Resources (LDNR) needs one facility removed in Bully Camp Field, LaFourche Parish. This project is subject to jurisdiction of the Lafayette District Office. Bidders shall submit the name, address, phone number, Federal Tax ID number, and a description of the nature of the work for each proposed subcontractor. Question Deadline 04/29/2024 at 4:30 PM CT Any questions relating to this bid shall be submitted in writing to Roby Fulkerson at P.O. Box 94275, Baton Rouge, LA 70804, email (roby.fulkerson@la.gov) or (james.landry@la.gov) or fax number 225- 342-2584 by no later than 4:30 p.m., five consecutive days after the site visit. No other questions shall be allowed or answered after this time, without exception. PLUGGING EQUIPMENT A. Rig - Workover rig capable of plugging wells in this bid package. The rig package shall include a minimum of a four (4) man crew plus tool pusher, power tongs, weight indicator, and all handling tools as needed for tubings; 2-1/2", 2 3/8'' work string and "small diameter" pipe. Rig must be able to pull doubles (66'). a. Tubing pull is required as per procedure. B. Hydraulically actuated blowout preventers rated to a minimum 10,000 psi working pressure. a. Includes annular, pipe, and blind rams. b. Cross overs required to nipple BOP's to wellheads. C. Full opening pressure safety valve rated to a minimum 10,000 psi working pressure (internal and external rating). D. Circulating pump capable of pressuring up and circulating to 10,000 psi at 3 barrels per minute minimum. All connections in the line from the pump to wellhead shall also be rated to 1000 psi. E. 80 barrel steel circulating tank F. Sufficient length of EUE work string drifted, tested and certified to have less than 12.5% maximum body wall loss (white band) and "small diameter" pipe. G. Normal fishing tools required to retrieve tubing. For example: overshot(s), grapple(s), spear(s), ETC. H. Wireline and/or slick line. FACILITY REMOVAL EQUIPMENT A. All heavy duty equipment necessary for removal, included but not limited to; i. Cranes ii. Barges iii.Fluid Handling B. Offshore wells will require site clearance. Procedure for Production Platform Removal and Site Restoration 1. Remove subject facility, production equipment, trash and debris, and all other material contained on the wooden platform (including all pilings). 2. Remove all structure a minimum 10' below mud line (LSA-R.S. 43:XI.311(E)(2)(C)). 3. The change order process will be utilized for NORM material. 4. Unburied flowlines/pipelines entering or leaving the platform that are located within the site clearance radius are to be purged and totally removed within the radius area with the ends cut, capped and buried. Buried flowlines entering or leaving the platform are to be purged with the ends cut, capped and buried. 5. Perform a Site Clearance & Verification Survey and well site. The Site Clearance and Verification Survey will be conducted within a radius of 400' from the geometric center of the facility and wellsite. This search is to identify and physically describe debris located within the 400' radius that must be removed during site clearance to allow for passing a Verification Survey. Site must pass a 400' radius survey. (See Section 2, Item 27). Note: Contractor must provide absorbent and/or containment booms to contain any sheen material that might be generated by the removal operations. Restore any bottom damage caused by removal operations ITEM DESCRIPTION COST 1. Remove Facility - 240424 2. Site Clearance - 71884 a. Hot Tap (do not include in total bid) b. Cement Plug (do not include in total bid) c. Additional Re-entry Cost (do not include in total bid)

Bid Results

Playgrounds / Parks / Athletic Fields

$675,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
50
Bidding Soon
551
All Active Projects
242
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

June 10, 2024

img_map_placeholder

To Be Determined, Baton Rouge, LA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.