BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Pullman, Washington. Completed plans call for site work for a swimming pool.

Reaney Park Pool Complex Lap Pool Liner Please direct questions regarding this project to the office of the Architect, Studio+ Architects. Contact Joe Bazzoli, Senior Project Manager by e-mail at: joe@studioplusarchitects.com The scope of work consists of: removal of the existing concrete deck curb overhang and installation of a pvc deck edge around the perimeter of the Lap Pool - and the installation of a pvc pool liner in the Lap Pool - along with the standard patch - repair - and prep work of the existing concrete substrates for full membrane adhesion in order to provide a fully warrantied system. The local agency hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement - disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race - political affiliation - religion - gender - age - sexual orientation - disabilities - or any other protected status in consideration of an award. Preliminary Construction Estimate is: $144000. Contract Time: To be completed within 30 calendar days from N.T.P. for on-site construction. A bid bond in the amount of 5% of the total bid amount is required. The City of Pullman reserves the right to accept or reject any or all bids and to waive informalities.

Bid Results

Swimming Pools

$164,630.00

Public - City

Site Work

7

12

2

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
7
Bidding Soon
130
All Active Projects
57
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

May 23, 2024

img_map_placeholder

690 NE Reaney Way, Pullman, WA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.