BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 16, 2024 at 8:00 PM

Updated October 17, 2024

Site work and paving for a road / highway in Blacksburg, Virginia. Design plans call for site work for a road / highway; and for paving for a road / highway.

The Town of Blacksburg is soliciting proposals from qualified professional civil engineering services for the surveying, development of plat exhibits for right-of-way acquisition, and construction plan development for the Clay Street Sidewalk and Stormwater project. The project will result in the design of a new 5’ -6’ wide sidewalk connection along the south side of Clay Street from Church Street to Jefferson Street (approximately 2600 feet), with adjustments to Clay Street to facilitate bike mobility and improve storm drainage. The addition of sidewalk in this location would provide a connection between existing sections and complete the network along Clay Street. Curb, gutter, and a drainage network would be added along the length of the project, as needed, and the roadway section would be widened, where applicable, to provide appropriate on-road bike facilities. The addition of sidewalk and widening of the road will require stormwater management considerations and special attention will need to be given to the management of runoff due to the sensitive nature of the existing watershed. Small adjustments to the current Clay Street alignment, both vertical and horizontal, would be made to improve areas of poor sight distance and excess grade change. This project will complete the sidewalk on the south side of Clay Street and address safe pedestrian passages along the project length. VDOT standard curb and gutter is desired on both sides of the road. Design for adequately sized storm drainage shall be included in the project area. Stormwater management facilities may be located off-site due to topography and narrow project area. Question Deadline 04/17/2024 at 5:00 PM ET As of October 16, 2024, per owner a design team has been identified. The design/construction timeframe has not been fully developed. Design is expected to start within 30 days, at which time they will have a better idea. The Town expects to have 100% construction plans by March 2025.

Design

Roads / Highways

$3,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
21
Bidding Soon
728
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

Project location map

Clay St SW, Blacksburg, VA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.