BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2024 at 8:00 PM

Updated May 21, 2024

Site work and paving for a mixed-use development in Lansing, Michigan. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

Bridge rehabilitation including epoxy overlay, railing repairs, sidewalk repairs, substructure repairs, approach work on Martin Luther King Jr. Blvd over the Grand River, Shiawassee Street over the Grand River and Washington Avenue over the Grand River in the city of Lansing, Ingham County. This is a Local Agency project. Net classification required for this project is 1282 N9-1A In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Fa. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No MCS 33000 209873A N/A BFP 33000 208102A 24A0395 BFP 33000 209874A 24A0396 MI DOT - 2405 019 - Bridge Rehabilitation Including Epoxy Overlay, Railing Repairs, Sidewalk Repairs, Substructure Repairs, Approach Work on Martin Luther King Jr. Blvd

Award

Bridges / Tunnels

$1,168,959.00

Public - State/Provincial

Paving, Site Work

45

8

3

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
0
Bidding Soon
1,386
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2024

July 2, 2024

Project location map

S Martin Luther King Jr Blvd, Lansing, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.