BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2024 at 8:00 PM

Updated June 21, 2024

Site work and paving for a mixed-use development in Granite Falls, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of June 20, 2024, this project has not yet been awarded. A timeline for award has not yet been established.** A. The project involves but is not limited to the complete construction of public improvements for the reconstruction of several streets. Individual elements of work shall include, but are not limited to 1. Removal of gravel, sidewalk and driveways, pipe, and other miscellaneous items. 2. Grubbing. 3. Street excavation. 4. Storm sewer construction. 5. Concrete walk construction. 6. Concrete curbing and driveway pavement construction. 7. Bituminous street construction. 8. Turf restoration and erosion control construction. 9. Traffic Control. 10. Other miscellaneous work shown on the plans or specified herein. Est. Completion Date: July 25, 2025 13,000 CY Common Excavation 2,600 LF 4" - 8" Storm Sewer 16,000 CY Common Embankment 550 SF Concrete Sidewalk 11,500 Ton Aggregate Base & Surfacing 100 SY Concrete Driveway 3,300 Ton Hot Mixed Asphalt 1,140 LF Curb & Gutter 730 LF 15" - 18" Storm Sewer 6.0 ACRE Permanent Seeding

Bid Results

Sidewalks / Parking Lot

$1,630,804.00

Public - Federal

Paving, Site Work

61

17

5

8

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
14
Bidding Soon
317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2024

May 27, 2024

Project location map

Multiple Locations, Granite Falls, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.