EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 14, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in West Valley City, Utah. Completed plans call for site work for a water / sewer project.

Utilities including gas and power and water and sewer and electricity and utilities management and consulting services, and alternative forms of energy, solar panels and servicing . Electrical wire and cable and harness including conduit and fittings and circuit breakers .Hand tools including clamping and masonry and fastener and cutting and finishing and power tools and wrenches and drivers. Rehabilitation of the East Recreation Lift Station sewer vault. Work includes installing blast cleaning and installation of new epoxy coating. Removal, cleaning and reinstalling the internal equipment and platforms. Installing new light fixtures, replacing electrical conduits and sonic level sensor. Work requires bypass pumping. Project Budget - $245,000.00 The Work will be Substantially Completed 175 calendar days after the date of the Notice to Proceed. Owner Rights: The OWNER reserves the right to reject any or all bids or to waive any informality or technicality in any bid if deemed to be in the best interest of the OWNER. The Owner reserves the right to reject any or all bids and to determine which bid is, in the Owner's judgment, the lowest responsive responsible bid of a bidder or group of bidders. The Owner also reserves the right to waive any informality in any bid and to delete certain items listed in the bid as set forth therein. Bond Notes: Bid security in the amount of five percent (5%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bid Security will be returned to each unsuccessful Bidder after tabulation and award of the Construction Contract. The successful bidder will be required to furnish performance and payment bonds, each in an amount not less than one hundred percent (100%) of the contract price. Liquidity Damages: Time is the essence of the Contract Documents. CONTRACTOR agrees that OWNER will suffer damage or financial loss if the Work is not completed on time or within any time extensions allowed in accordance with Part 12 of the General Conditions. CONTRACTOR and OWNER agree that proof of the exact amount of any such damage or loss is difficult to determine. Accordingly, instead of requiring any such proof of damage or specific financial loss for late completion, CONTRACTOR agrees to pay the following sums to the OWNER as liquidated damages and not as a penalty. Late Contract Time Completion: One Thousand Dollars ($1,000.00) for each day or part thereof that expires after the Contract Time until the Work is accepted as Substantially Complete as provided in Article 14.5 of the General Conditions. The work to be performed consists of furnishing and installing the facilities and appurtenances thereto as included in the Contract Documents. The Work generally includes, but is not limited to, the following: 1. Obtaining all permits. 2. Project supervision. 3. Mobilization/Demobilization. 4. Rehabilitation of the East Recreation Lift Station sewer vault. Work includes installing blast cleaning and installation of new epoxy coating. Removal, cleaning and reinstalling the internal equipment and platforms. Installing new light fixtures, replacing electrical conduits and sonic level sensor. Work requires bypass pumping. 5. Installation of an impressed current cathodic protection system including rectifier, deep well anode bed, and connection to existing lift station. D. For information about the award of this Construction Contract, contact: Granger-Hunter Improvement District 2888 South 3600 West West Valley City, Utah 84119 Attention: Victor Narteh, P.E. Phone: 801-955-2247 Question Submission Close Date 4/24/2024 3:00 PM MDT

Bid Results

Water / Sewer

$542,813.00

Public - City

Site Work

12

15

29

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
33
Bidding Soon
581
All Active Projects
261
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2024

June 6, 2024

img_map_placeholder

1300 W Rosa Parks Dr, West Valley City, UT

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construction of East Recreation Lift Station Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.