BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Clearfield, Utah. Completed plans call for the renovation of a educational facility.

*As of July 11, 2024, project has been awarded to a CM, and is currently bidding Bid Package: Phase 1 (Demolition, Concrete, Fencing, Fire Sprinkler, Electrical, Refrigeration). Davis School District Professional Services Selection Committee seeks a Request for Proposal (RFP) for Construction Management / General Contractor (CM/GC) services for the Freeport Center Refrigeration Upgrades at Davis School District, Materials Distribution Center, Building G-5, Freeport West, Clearfield, Utah 84016 Q & A deadline: Apr 19, 2024 12:00:00 PM MT All requests for information regarding this project shall be submitted online The Professional Services Selection Committee will conduct a two-step selection process. o Step One will evaluate the submitted responses and create a short list for interviews. o Step Two will evaluate fee proposals. Contractors will upload their proposal and fee proposal as two separate files to online. The fee proposal does not count towards the page limit total. The contractor for the project must be a Utah Licensed General Contractor. Davis School District will enter into an agreement for the project with the successful Contractor. The Davis School District Board of Education reserves the right to reject any or all proposals, or to waive any formality or technicality in any proposal in the best interest of the district Fixed Limit of Construction Cost (FLCC) for the CM/GC is $3,765,000. Overall Scope of work: 3.) Replace and relocate BAC evaporative condensers for the EQ05 area. o Demolish existing cooler and freezer boxes o Demolish concrete for new in-floor heating for the freezer box o Install new electric in-floor heating for the freezer box. o Install a new freezer box using 5" thick IMP paneling with one high-speed roll-up door. o Install a new cooler box using 4" thick IMP paneling with one high-speed roll-up door. o Install and pressure test refrigeration piping for new cooler and freezer evaporators. o Install pipe insulation on suction lines for cooler and freezer evaporators. o Install equipment for remote monitoring and control of cooler and freezer box. o New concrete floor and interior finish repairs Priority #1 - Total Budgetary Estimated Cost. $1,376,243.03 The following costs are for the Refrigeration subcontractor work only and based on costs as of October 2023. o Install new upward draft compressor and condenser racks for B01 1979 Cooler and Freezer Boxes. 2.) Replace the Evapco evaporative condenser and Bitzer compressors in EQ03 for the 2003 cooler/freezer boxes. 1.) Demolish and replace the 1979 cooler and freezer boxes. Replace equipment for the 1979 cooler and freezer boxes. o Demolish existing compressor condenser racks for existing B01 1979 Cooler and Freezer Boxes. 4.) Provide and install a backup system (condenser and evaporators) for the B04 2003 Cooler box. Priority #1 : B01 - 1979 Cooler and Freezer Boxes I EQ01 - Equipment for B01 Cooler and Freezer Boxes Davis School District owns and operates several large freezers and coolers located at Building G4 and Building G5 in the Freeport Center. These are used for general food storage and for school food production. Some of the refrigeration boxes have aged to a point where the physical box has worn out and are no longer able to be repaired. Other boxes have failing refrigeration equipment needing upgrades. A Refrigeration Masterplan has been developed prioritizing the replacement of each freezer or cooler. Each priority identified will become a standalone project to be bid and constructed as funding becomes available. Fixed Limit of Construction Cost (FLCC) for the CM/GC is $3,765,000

Award

Educational

$3,765,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
30
Bidding Soon
548
All Active Projects
242
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

December 23, 2024

img_map_placeholder

Multiple Locations, Clearfield, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.