BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction, remodeling and renovation of an educational facility in Lake Worth Beach, Florida. Completed plans call for the construction of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The owner has selected a Construction Manager. The following firms were awarded: Kaufman Lynn Construction, Inc. Wharton-Smith, Inc. Lebolo Construction Management Inc Pirtle Construction Company D. Stephenson Construction, Inc. Proctor Construction Company KAST Construction LEGO Construction Co M/WBE's are encouraged to participate in the bid process. Proposers shall be capable of providing performance and payment bonds for 100% of the project cost. . In lieu of a bond, the College may accept a cashier's check, official bank check or money order in the amount of the bond. liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (1) of this section, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1) of this section. Question Deadline 04/19/2024 at 5:00 PM ET Answers Posted on and College Website 4/25/2024 5:00PM (EST) Scope of Work The purpose of this Request for Qualifications (Solicitation) is to review responses from firms interested in providing Construction Manager at Risk (CMAR) services and to select one or more firms to provide Construction Manager at Risk (CMAR) services through a Continuing Contract in accordance with Florida Statute 287.055 for various construction, remodeling, and renovation projects to Palm Beach State College facilities. Services will include a variety of construction projects located on any or all SIX (6) Palm Beach State College sites in Palm Beach County, Florida. These projects may include new buildings as well as remodeling, renovation, maintenance, and repair of existing facilities. Services awarded and work ordered under a Professional Services Agreement (Continuing Contract) in accordance with Florida Statute 287.055 and as authorized by the Palm Beach State College District Board of Trustees (College). Construction Manager at Risk (CMAR) Under a Continuing Contract. The College reserves the right, in its sole discretion, to accept or reject any or all proposals, part of proposals, and to waive minor irregularities or variances to specifications contained in proposals which do not make the proposal conditional in nature, and minor irregularities in the solicitation process. Preconstruction Work Scope (Subject to negotiation and modification) i. Meetings - The CMAR will attend Project Team meetings with the College and the Project A/E at regularly scheduled intervals throughout the Preconstruction Phase. ii. Timeline - The CMAR will prepare a design, estimating, and permitting timeline outlining the tasks required during the Preconstruction phase. iii. Estimates/Estimating - Design Development: The CMAR will prepare an updated Estimate based on drawings and specifications within TWENTY (20) calendar days of receipt of drawings and specifications. 1. Estimate No. 3 - 50% Construction Documents: The CMAR will prepare an updated Estimate based on drawings and specifications within TWENTY (20) calendar days of receipt of drawings and specifications. Any significant deviations from the previous estimate relative to quantities, costs and schedule will be identified along with a suggested action plan to realign the project with the budget. The Estimate will be a detailed and comprehensive exercise further narrowing the scope of assumptions and qualifications. iv. Guaranteed Maximum Price (GMP) Estimate - 100% Construction Documents: At 100% completion of the Construction Documents, the CMAR shall submit the Guaranteed Maximum Price Estimate within (30) calendar days of receipt of drawings and specifications. The Estimate will be a summary of general conditions, general requirements, insurances, bonds, fees, costs of the work and actual subcontractor proposals tabulated with detailed scope completeness and accuracy, along with assumptions and qualifications. v. Value Analysis and Constructability - Concurrent with each Estimate, the CMAR will submit a detailed list of value engineering options, complete with estimated costs and schedule impacts. The CMAR shall also provide the College with

Award

Educational

$4,000,000.00

Public - County

New Construction, Remodeling, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
53
Bidding Soon
1,152
All Active Projects
524
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2024

January 3, 2025

img_map_placeholder

4200 S Congress Ave, Lake Worth Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.