BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 10, 2024 at 8:00 PM

Updated April 14, 2024

This is a service / maintenance or supply contract in Frankfort, Kentucky. Contact the soliciting agency for additional information.

This document constitutes a Request for Proposals for a Professional Service Contract from qualified individuals and organizations to furnish those services as described herein for the Commonwealth of Kentucky, Department of Highways. This statewide contract is to provide necessary Statewide Pavement Rehabilitation Services. Five (5) consultants will be selected to provide these services on an as-needed basis for two (2) years. Project Manager - Ross Mills, P.E. User Division - Highway Design Approximate Fee - $4,000,000 per contract (Upset Limit) Work will be assigned via Letter Agreement, not to exceed $750,000 Project Funding - State and Federal Funds Contract Term - Two (2) Years Rehabilitation of pavement on selected routes to improve structural and functional capacity. Our mission is to develop projects for Pavement Rehabilitation. In order to achieve this, the Division of Highway Design is responsible for management of statewide consultants. Additional staff and specific expertise is needed periodically to accomplish this objective. The Consultant team shall include a DBE Participation Plan with their Response to Announcement to help the Department meet the 11.95% DBE goal established by FHWA. Agreements will be prepared to provide Engineering Services as needed for the development of plans and/or proposal construction documents. Required services will include all design engineering and studies required for the development of plans and/or construction proposal documents. The Department will provide the Consultant with pavement design/rehabilitation concepts and construction strategies for rehabilitation of each roadway section. The scope of effort required may vary according to each project but typically should involve the following activities: First Selection Meeting: May 6, 2024 Final Selection: May 22, 2024 Pre-Design Conference: May 29, 2024 Notice to Proceed: June 19, 2024 The method of contractor selection has not been determined at this time. KY DOT - RFP - Statewide Pavement Rehabilitation Services

Conceptual

Roads / Highways

$4,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
80
Bidding Soon
1,612
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2024

Project location map

Multiple Locations, Frankfort, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.