BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 31, 2024 at 8:00 PM

Updated December 3, 2024

Site work and new construction of a water / sewer project in East Brookfield, Massachusetts. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

West Street Well Fe and Mn Water Treatment Plant Project The work consists of the construction of a new water treatment plant (WTP) for the West Street Well, modifications to the existing wellhouse, and drilling and installation of a redundant, replacement well. Estimated Cost $6,250,000 All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Engineer via the Tighe & Bond website Pre-Filed sub trade bids are due direct to the owner 5-2-2024 for masonry, painting, misc metals, HVAC, plumbing, roofing, flashing, fire protection, & electrical. D/WBE participation is requested. Addendum #1-#2 have been issued as of 5-7-2024. Note from Associated Construction: The filed sub-bids have been posted. There were no bids for the HVAC portion so Associated Construction will be accepting bids for the HVAC work. The bid date is going to be extended in an addendum later this week. ACC is looking for pricing on or before 12 Noon 5/21/24.

Bid Results

Water / Sewer

$8,149,889.00

Public - City

New Construction, Site Work

108

22

15

6

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
654
Active Projects
282
Bidding Soon
4,510
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

July 8, 2024

Project location map

West St, East Brookfield, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.