Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 24, 2024 at 8:00 PM

Updated June 25, 2024

Renovation of a municipal facility in Jefferson City, Missouri. Completed plans call for the renovation of a municipal facility.

The project includes replacement of the existing Fire Alarm and Public Address Systems in the existing Harry S. Truman State Office Building. Including communications links between other buildings. MBE/WBE/SDVE Goals: MBE 0%, WBE 0%, and SDVE 3%. NOTE: Only MBE/WBE firms certified by the State of Missouri Office of Equal Opportunity as of the date of bid opening, or SDVE(s) meeting the requirements of Section 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project. POINT OF CONTACT: A. Designer: Insite Group, Jeremy Rogers, 816-228-2377, email: jeremy@insitegroup.net B. Project Manager: Michael Schrader, 573-536-7105, email: michael.schrader@oa.mo.gov Deposits for plans not returned within 15 working days shall be forfeited. If you want to verify that you are uploading documents correctly, please contact Paul Girouard: 573-751-4797, paul.girouard@oa.mo.gov ; April Howser: 573-751-0053, April.Howser@oa.mo.gov ; or Mandy Roberson: 573-522-0074, Mandy.Roberson@oa.mo.gov. The Work consists of replacing all existing fire alarm devices and equipment with new throughout the entire building. This will include updates and additions where required to meet all local, state, and federal codes. The work includes, but is not limited too: 1. Removing the existing fire alarm system and all related conduit and wiring. 2. Replacing the existing fire alarm system with a new addressable fire alarm system. 3. Removal and replacement of initiating and notification fire alarm devices throughout the entire building. 4. Asbestos evaluation. 5. New fire alarm conduit and wiring throughout entire building. 6. Providing new electrical circuits for the installation of new fire alarm system equipment. 7. Programming of all new fire alarm system equipment and related devices 8. Integrating the new fire alarm system to the existing Johnson Controls building management system 9. Integrating the new fire alarm system with the existing Capitol Police Monitoring system. 10. Integrating and connecting the new fire alarm system to the existing smoke evacuation system. 11. Connecting the new fire alarm system to the existing HVAC system for control. 12. Integrating the new fire alarm system with the access control system, to release locked doors during a fire alarm event. 13. Maintaining the existing systems, while new systems are installed to maintain an operational facility. 14. Repair/patch/paint walls, ceilings, and floor where old equipment is removed.

Award

Municipal

$1,358,875.00

Public - State/Provincial

Renovation

55

15

7

8

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
43
Bidding Soon
745
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

June 21, 2024

Project location map

301 W High St, Jefferson City, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed