BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2024 at 8:00 PM

Updated May 30, 2024

Site work, outdoor lighting and new construction of an educational facility in East Longmeadow, Massachusetts. Completed plans call for site work for a educational facility; and for outdoor lighting for a educational facility.

Accepting sealed bids from qualified contractors interested in providing the specific electrical services associated with Early Release Package #1 for the new East Longmeadow High School. Electrical scope included in this enabling package includes, but is not limited to: temp. power connection to OPM and CM trailers, make safe and salvage existing site lighting, temp. power to new pedestrian and vehicular access control gates. The expected timeline for this work is 6/3/24 - 12/31/24. The design team is currently in Detailed Design, with an expected completion date of Dec. 2024 for the 100% Construction Documents. We expect the value of the electrical scope within the Phase 1 Enabling Package to be greater than $25,000. Prequalification for all remaining filed sub bid trades pertaining to the main East Longmeadow High School Project, including the remaining electrical scope, will be performed at a later date

Post-Bid

Educational

$220,000.00

Public - City

New Construction, Outdoor Lighting, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
733
Active Projects
336
Bidding Soon
5,430
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2024

June 3, 2024

Project location map

180 Maple St, East Longmeadow, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.