BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Colby, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Bidders shall submit Proof of Responsibility statements before 5 p.m., Thursday, April 25, 2024, to the office of the engineer by methods of email (dknoeck@msa-ps.com), fax (715-384-9787), or by postal mail (146 North Central Avenue, Suite 201, Marshfield, Wisconsin 54449). An approved prequalified general contractor list will be posted to online by 5 p.m. Friday, April 26, 2024. The project includes the following work: The project will construct a new connector street from STH 13 to Community Drive, approximately 550 feet; and a new frontage road south of the connector street, approximately 470 feet. Both roadway widths measure 34 feet from back of curb to back of curb and consist of 4-inch asphalt pavement over 8-inch base aggregate over 12-inches of select crushed material with SAS fabric and drain tile. The project also includes new storm sewer catch basins, leads and a bio-retention stormwater basin. The project also includes work on the STH 13 median including curb & gutter and pavement removal, storm sewer removal, street lighting and pull box removal as well as new street lighting, conduit and concrete based, median restoration and paving. The anticipated substantial completion date is September 13, 2024 and final completion date is September 27, 2024. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the owner as liquidated damages. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with the wage rate scale established by local wage rates. Owner reserves the right to waive any informalities or to reject any or all bids. Question Deadline 04/25/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Dan Knoeck, PE | dknoeck@msa-ps.com, (715) 304-0305

Award

Water / Sewer

$545,998.00

Public - City

Paving, Site Work

48

13

2

9

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
15
Bidding Soon
182
All Active Projects
68
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 3, 2024

img_map_placeholder

Multiple Locations, Colby, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.