Site work and paving for a sidewalk / parking lot in Rutland, Vermont. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of April 30, 2024 project was awarded but awarded amount is not available.** The City of Rutland is soliciting bids from experienced Contractors to remove and replace sidewalk a total of 2,230 linear feet of sidewalk, on the west side of Forest Street, from Convent Avenue to a location approximately 70 feet north of Traverse Place and on the east side of Forest Street from Franklin Avenue to the Pine Street intersection. Contractors shall erect and maintain all necessary safeguards for such safety and protection. It shall be the duty and responsibility of all contractors and their respective subcontractors to be familiar with and comply with 29 USC Section 651, et seq., the Occupational Safety and Health Act of 1970, as amended ("OSHA Act") and to enforce and comply with all provisions of this Act. If the City observes any situations which are in violation of this requirement, the Contractor will correct the violation immediately at their own expense. Work may not continue until the violation is corrected. If the City observes repeated violations, the City will consider this a breach of contract and may terminate the contract between the City and the Contractor without liability. The Contractor will be paid for work completed, and the Contractor will be responsible for paying any fines incurred by the City because of actions of the Contractor. All questions related to this Invitation to Bid shall be directed to Ted Gillen, Assistant City Engineer, at (802) 774-7819 or by email at tedg@rutlandcity.org. Project Description The Contractor shall remove all existing sidewalk and install new concrete sidewalk on the west side of Forest Street, from Convent Avenue to a location approximately 70 feet north of Traverse Place and on the east side of Forest Street from Franklin Avenue to the Pine Street intersection. The total amount of installed sidewalk is 2,230 linear feet. The sidewalk to be removed is composed of concrete and asphalt. New sidewalks to be installed shall be 5 ft wide concrete as specified in these documents. This work must be completed during the 2024 construction season.

Award

Sidewalks / Parking Lot

$276,550.00

Public - City

Paving, Site Work

3

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
48
Bidding Soon
892
All Active Projects
376
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2024

May 22, 2024

img_map_placeholder

Forest St, Rutland, VT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.