BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Macedonia, Ohio. Completed plans call for site work for a bridge / tunnel.

Each Bid must contain the full name or names of the party or parties making the same, with an affidavit as to interested parties and in the case of a corporation not chartered in Ohio, with a proper certificate that such corporation is authorized to do business in Ohio. The project consists of cleaning and rehabilitation of an existing corrugated metal culvert with a structural geopolymer lining and maintenance of water flowing within the culvert, and grading the roadside along Valley View Road above the culver Each bidder is required to furnish with its Proposal a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code or a certified check or cashier's check equal to ten percent (10%) of the amount bid, payable to the City of Macedonia. The Bid security in Bond form shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. The Bid Guaranty will be held, if the Bid Proposal is accepted, to guarantee a Contract will be entered into in accordance with ORC 153.54. The price of material and labor bid for shall be separately stated. Additional sets of bid documents can also be ordered for an additional cost by visiting online, emailing seblue@seblueprint.com, calling 216-241-2250 or visiting an SE Blueprint location. Bidders must use the printed forms of Proposal available aforesaid, as none other will be accepted. All contractors and subcontractors involved with the project will, to the extent practicable, use Ohio Products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, The Governor's Executive Order of 1972, and Governor's Executive Order 84-9 shall be required. Bid Guaranty and Contract Bond or check, as the case may be, will be held as a guarantee that, if the Bid Proposal is accepted, a Contract will be entered into between the bidder and the City of Macedonia, and the performance of such Contract secured by said check or bond. In default thereof said bond or check, and the amount represented thereby, shall be forfeited to the City of Macedonia as liquidated damages. Council of the City of Macedonia reserves the right to reject any and all bids, to waive any informalities in the bids received, and to accept any bid which it deems most favorable to the City.

Bid Results

Bridges / Tunnels

$81,788.00

Public - City

Site Work

5

9

4

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
58
Bidding Soon
898
All Active Projects
360
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2024

May 29, 2024

img_map_placeholder

Valley View Rd, Macedonia, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.