BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and addition to an educational facility in Flint, Michigan. Completed plans call for the addition of a educational facility; and for the remodel of a educational facility.

This project will consist of the following: - Large addition onto the existing Early Childhood Programs & Services building. - Complete remodel of the existing building. - Several site upgrades including utilities, stormwater detention, playgrounds, sidewalks, asphalt, and landscaping DESCRIPTION: Addition and Renovation to GISD's Early Childhood Programs & Services Building Start Date 05/27/2024 End Date 03/31/2025 All questions during the bidding period shall be referred to Clark Construction Company: CONTACT: Spencer Cota, Project Manager TELEPHONE: 248.881.7527 EMAIL: scota@clarkcc.com Question Deadline 04/18/2024 Questions must be submitted in writing to the Construction Manager at least seven (7) days before the date for receipt of Bids to allow time for written Addenda to be issued contact Spencer Cota - scota@clarkcc.com A. Alternate No. A-1: Exclusion of mullion extension from Base Bid at all new storefront window locations. 1. Base Bid: Include mullion extension at new storefront framing as shown in Drawings A6.1 and A6.3 and as specified in Section 084113 "Aluminum Framed Entrances and Storefronts." 2. Alternate: Exclude mullion extension at all areas shown as indicated on Drawings A6.1 and A6.3. B. Alternate No. A-2: Exclusion of Garage scope from Base Bid. 1. Base Bid: Garage repairs to be included as indicated on Drawing A0.4 - Garage. 2. Alternate: Exclude all garage repair scope as indicated on Drawing A0.4 - Garage. C. Alternate No. A-3: Exclusion of baffle ceiling system in select spaces from Base Bid scope. 1. Base Bid: Include ceiling baffle systemin all areas as indicated on Drawing A2.1, A2.2, A2.3, and A2.4 Reflected Ceiling Plans and as specified in Section 098439 "Acoustical Ceiling Cloud." 2. Alternate: Exclude baffle system in areas Corridor 114, Admin 227, Corridor 303 as indicated on Drawing A2.1, A2.2, A2.3, and A2.4 Reflected Ceiling Plans. D. Alternate No. A-4: Standard blackout roller shades in lieu of acoustically certified black out roller shades. 1. Base Bid: [E-Screen 1% or M-Screen 1% by Mermet (NRC 0.50) acoustically certified black out roller shades as indicated on Drawings A1.21, A1.22, A-1.23, and A-1.24 and as specified in Section 122413 "Roller Window Shades." 2. Alternate: Light-Blocking Fabric: Opaque fabric, stain and fade resistant. roller shades as indicated on Drawing A1.21, A-1.22, A-1.23, and A-1.24 and as specified in Section 122413 "Roller Window Shades." E. Alternate No. A-5: Fire-rated hollow metal door frame in lieu of fire-rated aluminum door frame at door number 218B. 1. Base Bid: Door 218B shall be a fire-rated aluminum door frame as indicated on Drawings A6.1 - Door Schedule & Opening Elevations and as specified in Section 084113 "Aluminum Framed Entrances and Storefronts." 2. Alternate: Door 218B shall be a fire-rated hollow metal door frame as indicated on Drawings A6.1 - Door Schedule & Opening Elevations and as specified in Section 081113 "Hollow Metal Doors and Frames." F. Alternate No. L-1: Natural turf in lieu of synthetic turn in select areas of outdoor learning area. 1. Base Bid: Area in southern playground area shall be synthetic playground turf as indicated on Drawing L3.1 - Playground Site Plan. 2. Alternate: Area in southern playground area shall be natural turf as indicated on Drawing L3.1 - Playground Site Plan. G. Alternate No. M-1: Pre-purchase select mechanical equipment prior to June 2024 to procure equipment prior to manufacturer changeover to new refrigerants. 1. Base Bid: RTU's shall be provided with R-454B refrigerant as indicated on Drawing M6.0 - Mechanical Schedules. 2. Alternate: RTU's shall be provided with R-410A refrigerant as indicated on Drawing M6.0 - Mechanical Schedules.

Bid Results

Educational

$5,000,000.00

Public - County

Addition, Remodeling

164

88

79

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
327
Active Projects
189
Bidding Soon
2,601
All Active Projects
1,051
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 25, 2024

May 27, 2024

March 31, 2025

img_map_placeholder

5089 Pilgrim Rd, Flint, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.