BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2024 at 8:00 PM

Updated May 3, 2024

Renovation of an educational facility in New York, New York. Completed plans call for the renovation of a educational facility.

The Work of the Project is defined by the following Project Description herein below and by the Contract Documents. The project is the painting of the dormitory rooms, utility closets, and corridors on the 6th, 7th, 8th, and 9th floors of the Coed Residence Hall. The following elements are included in the project: 1. Prep, prime & paint all surfaces as indicated on plan and specs. 2. Provide protection for all surfaces as required. 3. Paint existing sprinkler piping & surface mounted conduit to match wall. convectors, sprinkler heads & pipe covers are to remain unpainted and to be protected from painting. 4. Existing bulletin board to be painted to match wall. all other signage to remain & to be painted around. 5. Prior to painting doors & frames all surfaces requiring repainting to be cleaned. contractor to remove all loose and flaking and sand surface smooth as required to receive new paint. No telegraphing of lines, ridges, flakes, etc. through new painting is permitted. When this occurs, contractor shall be required to sand smooth and re-finish until surface meets with architect's approval. 6. Prior to painting, the headers of all existing closets to be secured to the walls & ceiling using angle brackets. provide additional shims & blocking as required. apply spackle /putty to fill all voids. 7. Prior to painting, contractor to remove all wall base. sand, patch and repair as needed to remove any remnant adhesive or line from wall base. fit will be responsible for installation of new wall base upon substantial completion of painting. 8. Contractor responsible for moving all furniture into the middle of each room and provide protection for furniture. Contractor will be responsible for general resetting of the furniture after project completion. No furniture is to be moved out of the room. No furniture is to be stacked. 9. Contractor to patch & repair any damaged sheetrock prior to painting. 10. Remove existing window shades, store & reinstall after the substantial completion of the project. Questions shall be submitted in writing to the attention of Purchasing Department via email: purchasingbids@fitnyc.edu, no later than Thursday, April 25, 2024, on or before 3:00 P.M. A. Provide materials, labor, equipment and services to complete cutting and patching as specified herein and as indicated on the Drawings.

Post-Bid

Educational

$90,000.00

Public - State/Provincial

Renovation

8

16

10

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Closeout Submittals, Bonds
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Storm Drainage, Sump Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Assembly and Testing Equipment

Find More Local Projects

Within 75 Miles of This Project
1,216
Active Projects
609
Bidding Soon
8,039
All Active Projects
3,577
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

May 28, 2024

img_map_placeholder

227 W 27th St, New York, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.