Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Osage Beach, Missouri. Completed plans call for the renovation of a water / sewer project.
As of June 19,2024, this project has not yet been awarded. The project is expected to be awarded on July 1, 2024. Construction and installation of a new standby generator to serve the Walker Cay Lift Station. Construction includes new underground electric conduit and cables from the existing service to the generator and existing control panel, standby generator and pad, ATS, associated electrical enclosures and appurtenances for operation. The prevailing hourly rate ofwages, as determined by the Federal Wage Determination and/or the Industrial Commission ofMissouri, Annual Wage Order #30, including amendments, will be complied with on this project, and not lessthan the prevailing hourly rate ofwages as found by the agencies or Court ofAppeals shall be paid to all workmen performing work under this contract. No bidder may withdraw his bid within 60 days after the actual date ofthe opening thereof. Any Bidder or equipment supplier whose firm or affiliate is listed on the General Services Administration (GSA) publication entitled "Lists of Parties Excluded from Federal Procurement or Non-procurement Programs" will be prohibited from the bidding process. Anyone submitting a bid who is so listed will be determined to be a non-responsive Bidder in accordance with 40 CFR 31. Bidders on this work will be required to comply with the President's Executive Order No. 11246 in regard to non-discrimination in employment. Bidders are informed that the Project is subject to the requirements of Section 292.675, RSMo, which requires all contractors or subcontractors doing work on the Project to provide, and require its on-site employees to complete, a ten (10) hour course in construction safety and health approved by the Occupational Safety and Health Administration ("OSHA") or a similar program approved by the Missouri Department ofLabor and Industrial Relations which is at least as stringent as an approved OSHA program. The training must be completed within sixty (60) days ofthe date work on the Project commences. On-site employees found on the worksite without documentation ofthe required training shall have twenty (20) days to produce such documentation. All disputes under this contract and any litigation resulting under this contract shall be filed, tried, remain and be ultimately resolved in the Circuit Court ofCamden or Miller County on any appeal therefrom within the courts ofthe State ofMissouri. The contractor hereby knowingly, intelligently and voluntarily agrees and waives any and all removal rights to federal court or the right to litigate the claim or any part thereof in courts of any other state for any reason.
Award
Water / Sewer
$156,477.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 16, 2024
June 17, 2024
Multiple Locations, Osage Beach, MO
Related To This Project
Osage Beach, MO
Bid Date: May 16 2024
Osage Beach, MO
Bid Date: Jun 28 2024
Osage Beach, MO
Bid Date: May 09 2024
Osage Beach, MO
Bid Date: Aug 08 2024
Osage Beach, MO
Bid Date: Jul 09 2024
Osage Beach, MO
Bid Date: Sep 06 2024
Osage Beach, MO
Bid Date: Sep 17 2024
Osage Beach, MO
Bid Date: Nov 14 2024
Osage Beach, MO
Bid Date: Apr 25 2024
Osage Beach, MO
Bid Date: Apr 30 2024
Osage Beach, MO
Bid Date: Apr 11 2024
Osage Beach, MO
Bid Date: Mar 14 2024
Osage Beach, MO
Bid Date: Mar 07 2024
Osage Beach, MO
Bid Date: Aug 09 2024
Osage Beach, MO
Bid Date: Dec 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.