Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Afton, Iowa. Completed plans call for site work for a road / highway; water / sewer project; bridge / tunnel; and for paving for a road / highway.
**As of June 19, 2024, project was awarded to C & J Conservation in the amount of Divion1 $83,838 and Division2 $55,910 total amount of $139,748.** Grading and Surfacing Improvements - Excavation, Class 10 - 3,170 CY; Subgrade Preparation (12" Thick) - 2,475 SY; Compaction Testing - 1 LS; Pipe Culvert, RCP, 15" - 65 LF; Granular Surfacing, Class 'A', 2" Thick - 2,475 SY; Granular Surfacing, Macadam, 6" Thick - 2,475 SY; Conventional Seeding, Fertilizing, and Mulching - 1 LS; SWPPP, Preparation - 1 LS; SWPPP, Management - 1 LS; Mobilization - 1 LS LOW BIDS Division 1: Low: C & J Conservation $83,838 2nd: TK Concrete $102,338 3rd: Western Iowa Utilities $112,505 4th: JNC Construction $113,550 5th: Hymbaugh Construction $119,260 6th: J & K Contracting $148,595 Sewer and Water Improvements - Sanitary Sewer Force Main, Trenchless, HDPE, 1-1/4" - 1,040 LF; Sanitary Sewer Service Stub, Trenched, PVC, 6" - 170 LF; Sanitary Sewer Cleanout - 2 EA; Water Main, Trenchless, RJ-PVC, SDR 17, 2" - 790 LF; Water Service Pipe, PE, 1" - 55 LF; Water Service Pipe, Corporation, 1" - 2 EA; Water Service, Curb Stop and Box, 1" - 2 EA; Water Service Valve and Box, 3" - 1 EA; Water Main Connection No. 1 - 1 EA; Yard Hydrant - 1 EA; Simplex Grinder Pump Station - 1 EA; Mobilization - 1 LS LOW BIDS DIVISION 2: Low: C & J Conservation $55,910 2nd: Western Iowa Utilities $64,425 3rd: Vicker Drilling $77,520 4th: Hoffman Communications $81,605 5th: Hymbaugh Construction $85,240 6th: J & K Contracting $86,075 Est. Value Notes: Div 1 - $121,390.00 , Div 2 - $89,675.00 Each bidder shall accompany its bid with bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in form acceptable to Union County Conservation Board, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check, a certified check, or a bank money order drawn on a FDIC insured bank in Iowa or on a FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the Union County Conservation Board. The bid shall contain no condition except as provided in the specifications. Liquidated damages in the amount of Six Hundred Dollars ($600.00) per working day will be assessed for each day that the work shall remain uncompleted after the end of the contract period with due allowance for extension of contract period due to conditions beyond the control of the Contractor. Successful Bidder will be required to furnish Performance, Payment and Maintenance Bond acceptable to the Union County Conservation Board on the form provided in the specifications in amounts equal to one hundred percent (100%) of the contract price. The contracts shall be fully completed and ready for final payment within 25 working days from written Notice to Proceed for each Division
Award
Roads / Highways
$139,748.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2024
May 31, 2024
Multiple Locations, Afton, IA
Related To This Project
Afton, IA
Bid Date: Aug 15 2024
Afton, IA
Bid Date: Aug 15 2024
Afton, IA
--
Afton, IA
Bid Date: Nov 19 2024
Afton, IA
Bid Date: Mar 20 2024
Afton, IA
Bid Date: Apr 16 2024
Afton, IA
Bid Date: Mar 19 2024
Afton, IA
Bid Date: Jan 24 2024
Afton, IA
Bid Date: Jan 17 2024
Afton, IA
Bid Date: Mar 15 2022
Afton, IA
Bid Date: Mar 15 2022
Afton, IA
Bid Date: Jul 20 2023
Afton, IA
Bid Date: Jun 06 2023
Afton, IA
Bid Date: Apr 18 2023
Afton, IA
Bid Date: Mar 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.