Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 29, 2025 at 8:00 PM
Updated April 30, 2025
Site work and paving for a civil project in Elk River, Minnesota. Design plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.
As of April 29, 2025, project is in 95% design completion. Design team not identified. Construction scheduled to start June 2025 with completion in October 2025. MnDOT requests letters of interest for professional and technical assistance for the development of Construction Limits, Highway Design Plans, Material Recommendation, and Special Provisions for SP 4901-82 (US10). The project is located from Gregory to Halfway Crossing (Benton County Road 40) includes rehabilitation recommendation, installation of a J-turn at Halfway Crossing, hydraulic improvements (centerline culverts), and temporary traffic control and detour/staging design. The goal of this project is to provide roadway, traffic and hydraulic design plans and special provision to be used for highway design. The project manager and District staff will review the Hydraulic Recommendations, Material Design Recommendation, 30%, 60%, and 90% plans and special provisions before approving them. Prospective, pre-qualified responders who have any questions regarding this request for letters of interest must submit questions, by e-mail, to the Contract Administrator: Michael Friberg Michael.friberg@state.mn.us Questions regarding this announcement must be received, via e-mail, by the Contact Administrator identified above no later than 2:00PM Central Daylight Time on 04/16/2024. MnDOT anticipates posting answers to all questions received by 2:00PM Central Daylight Time on 04/18/2024. MNDOT: RFP Engineering - US 10 Pavement Rehabilitation and J-Turn
Design
Roads / Highways
$500,000.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2025
US-10, Elk River, MN
Related To This Project
Elk River, MN
Bid Date: May 09 2024
Elk River, MN
--
Elk River, MN
Bid Date: Jun 20 2024
Elk River, MN
Bid Date: Jun 24 2024
Elk River, MN
Bid Date: Jun 28 2024
Elk River, MN
--
Elk River, MN
Bid Date: Aug 09 2024
Elk River, MN
Bid Date: Apr 25 2024
Elk River, MN
Bid Date: Apr 09 2024
Elk River, MN
--
Elk River, MN
Bid Date: Jan 27 2021
Elk River, MN
Bid Date: Jun 20 2019
Elk River, MN
Bid Date: Mar 24 2021
Elk River, MN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
