Renovation of a municipal facility in Cleveland, Ohio. Completed plans call for the renovation of a municipal facility.

Fire Loss Renovation at 4505 Dandridge Circle The overall scope of work will include but is not limited to carpentry, plumbing, electrical, drywall, patch & repairs, painting, luxury vinyl plank flooring (glue-down method), and cleaning In addition, work includes new insulated steel exterior doors, siding, new windows, cove base, interior doors, trim and hardware, new kitchen cabinets,3/4 inch plywood subflooring, and new appliances, laundry hook ups, interior accent wall color. All Interior Colors to be selected by Owner. All Interior Colors to be selected by Owner. The work to be performed under this contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C.1701u ( Section 3) The construction estimate range for this project is between $126,179.00 - $174,247.00 Owner reserves the right to reject any and all bids received and waive any informality in bids received whenever such rejection or waiver is in the best interest of CMHA Bidder accepts that CMHA reserves the right to reject any and all bids received and waive any informality in bids received whenever such rejection or waiver is in the best interest of CMHA. LABOR - all field labor shall be priced at the current base rate, excluding fringe benefits, of the prevailing wage in the Project locality Bidder accepts the provisions of this Solicitation for liquidated damages in the amount of $850.00 per day in the event of Bidder's failure to complete the Work within the Contract performance period in accordance with Clause 33 of the General Conditions for Construction Contracts (HUD Form5370). (a) If the Contractor fails to complete the work within the time specified in the contract, or any extension, as specified in the clause entitled Default of this contract, the Contractor shall pay to Owner as liquidated damages the sum of $850.00 for each day of delay. If different completion dates are specified in the contract for separate parts or stages of the work, the amount of liquidated damages shall be assessed on those parts or stages which are delayed. To the extent that the Contactor's delay or nonperformance is excused under another clause in this contract, liquidated damages shall not be due Owner. The Contractor remains liable for damages caused other than by delay. (b) If Owner terminates the Contractor's right to proceed, the resulting damage will consist of liquidated damages until such reasonable time as may be required for final completion of the work together with any increased costs occasioned Owner in completing the work. (c) If Owner does not terminate the Contractor's right to proceed, the resulting damage will consist of liquidated damages until the work is completed or accepted. Each bid must be accompanied by a properly executed Bid Bond, Certified Check, or Cashier's Check on a solvent bank, made payable to the Cuyahoga Metropolitan Housing Authority in an amount which shall not be less than ten percent (10%) of the total amount of the Bid. Questions will be received in writing no later than 10:00am local time on Friday, April 26, 2024, via email at cousotrigoy@cmha.net Responses to all questions will be posted as an addendum *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Municipal

$146,655.00

Public - County

Renovation

4

19

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
62
Bidding Soon
1,111
All Active Projects
337
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2024

June 10, 2024

img_map_placeholder

4505 Dandridge Cir, Cleveland, OH


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.