BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Spring Hill, Florida. Completed plans call for site work for a water / sewer project.

Killian Water Treatment Plant Upgrade Question Deadline 05/20/2024 WORK COVERED BY CONTRACT DOCUMENTS/REQUIREMENTS A. The work covered by this Contract consists of furnishing all labor, equipment, and materials, and in performing all operations in connection with construction of the improvements to the Killian Water Treatment Plant (WTP), complete and ready for use in accordance with the applicable plans and specifications, and subject to the terms and conditions of the Contract. The Work to be performed under these Contract Documents includes, but is not limited to the following: 1. Installation of a new well pump and wellhouse at the existing KI-5 well. 2. Construction of a new high service pump station, including concrete foundation, CMU walls, metal roof, pre-engineered wood truss roof supports, pipe gallery, electrical room, crane rail hoist, and roll-up door. 3 Furnish and install three (3) horizontal split case pumps, pump control panel, associated piping and valves, and equipment pads. 4. Furnish and install a central sodium hypochlorite storage and feed system, including an above ground chemical injection assembly prior to the ground storage tank. Also included is a pre-engineered metal fabricated building to cover the sodium hypochlorite tank and associated metering pumps. 5. Furnish and install a new generator and fuel storage system. 6. Demolition of existing high service pump station, salvage of select pump station components. 7. Yard piping, including demolition and abandonment of existing yard piping. 8. Civil/site work, including construction of two stormwater management ponds 9. Landscaping and grading of the existing site area 10. Restoration 11. General electrical system improvements B. The project also includes all other work required for a complete and fully operational system as described in the Technical Specifications and shown on the Contract Drawings. C. The Contractor shall furnish all shop drawings, working drawings, labor, materials, equipment, tools, services, and incidentals necessary to complete all work required by these Specifications and as shown on the Contract Drawings. D. The Contractor shall perform the work complete, in place and ready for continuous service and shall include any repairs, replacements, and/or restoration required as a result of damages caused prior to acceptance by the County. E. The Contractor shall furnish and install all materials, equipment and labor which is reasonably and properly inferable and necessary for the proper completion of the work, whether specifically indicated in the Contract Documents or not. F. See the appropriate Sections of these Specifications for detailed information on materials, equipment, and installati

Award

Water / Sewer

$6,196,439.00

Public - County

Site Work

65

47

25

6

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
323
Active Projects
143
Bidding Soon
2,432
All Active Projects
971
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 1, 2024

September 2, 2024

December 9, 2025

img_map_placeholder

12351 Killian St, Spring Hill, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.