Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 23, 2024 at 8:00 PM
Updated May 24, 2024
Site work and paving for a road / highway in Blue Hill Township, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Construction of the 146th St, 285th Ave, 286th Ave Improvement Project Sawing Bituminous Pavement (Full Depth) 256 Lf Aggregate Base Class 5 70 Ton Shoulder Base Aggregate Class 2 180 Ton Full Depth Bituminous Pavement Reclamation (P) 8,500 Sy Type Sp 9.5 Wearing Course Mixture (2,b) 1,050 Ton Type Sp 12.5 Non Wearing Course Mixture (2,b) 1,050 Ton Type Sp 9.5 Wearing Course Mixture (2,b) 2.5" Thick 260 Sy 6" Concrete Driveway Pavement 810 Sf Mail Box Support 17 Ea Install E911 Signs 15 Ea Install Sign and Post 3 Ea Silt Fence, Type Machine Sliced 200 Lf Select Topsoil Borrow 270 Cy Soil Bed Preparation 1 Acre Seeding 1 Acre Seed, Mixture 25-151 110 Lb Hydraulic Stabilized Fiber Matrix 2,700 Lb Question Deadline 04/25/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered.
Award
Roads / Highways
$256,399.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 2, 2024
June 3, 2024
Multiple Locations, Blue Hill Township, MN
Related To This Project
Blue Hill Township, MN
Bid Date: Mar 10 2025
Blue Hill Township, MN
Bid Date: Mar 10 2025
Blue Hill Township, MN
Bid Date: Mar 25 2024
Blue Hill Township, MN
Bid Date: Jul 21 2022
Longville, MN
Bid Date: May 07 2024
Prior Lake, MN
Bid Date: May 14 2024
Stillwater, MN
Bid Date: May 08 2024
Little Falls, MN
Bid Date: May 09 2024
Montgomery, MN
Bid Date: May 08 2024
Cloquet, MN
Bid Date: May 14 2024
New London, MN
Bid Date: May 01 2024
Cook, MN
Bid Date: Feb 28 2025
Hutchinson, MN
Bid Date: May 09 2024
Owatonna, MN
Bid Date: Apr 26 2024
North Mankato, MN
Bid Date: May 14 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
