BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 22, 2024 at 8:00 PM

Updated May 23, 2024

Site work for a bridge / tunnel in Worthington, Ohio. Completed plans call for site work for a bridge / tunnel.

**As of May 22,2024, the sole bidder is Complete General Construction with the amount of $1,698,324.10.** Project consists of the replacement of the existing culvert carrying W Selby Blvd over Rush Run. The existing structure is twin precast reinforced concrete box culverts with 12-ft span and 8-ft rise. The proposed structure is a precast reinforced concrete three-sided flat top culvert with a 26' span x 7' - 2" rise and a length of approximately 72-ft. The proposed culvert will be sitting on cast-in-place base slab. Please note there is a DBE Goal of: 8%

Bid Results

Bridges / Tunnels

$1,698,324.00

Public - City

Site Work

40

3

84

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
139
Bidding Soon
2,517
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

July 22, 2024

Project location map

N Selby Blvd, Worthington, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.