Demolition and site work for a municipal facility in Painesville, Ohio. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

As of June 13, 2024 project was awarded to Eagle Abatement & Demolition, awarded amount is $224,433.01 and to ProQuality Demolition, awarded amount is $367,800.00. All work including restoration and clean-up shall be completed no later than the contract completion date. Failure to complete all work within the allotted time will result in assessment of liquidated damages. Upon completion of all work and written notification of same by the Contractor, the Engineer and Owner will compile a punch list. The punch list will be sent to the Contractor. All punch list work shall be completed to the satisfaction of the Engineer and the Owner within 14 days after receipt of the punch list. Failure to complete the punch list work within the allotted time will result in assessment of liquidated damages. All questions during bidding should be addressed to William G. Gallagher, AIA, NCARB, who can be reached at CT Consultants, Inc., 8150 Sterling Court, Mentor, Ohio 44060 at (440) 477-7411. The specifications, scope of work, etc. are not intended to describe nor illustrate the material, labor, and equipment necessary to perform the work. These documents represent the Owner's best estimate of the extent and presence of asbestos-containing material and hazardous materials to be removed during this project. It is the responsibility of the Contractor to determine the precise linear footage, square footage of ACM, number of ballasts, etc., for bidding purposes. No extra compensation will be allowed for differences between the best estimate and actual quantities of material to be removed. The structures to be demolished are located at 99 East Erie Street, 125 East Erie Street, 175 East Erie Street 209 North St. Clair Avenue in Painesville Ohio 44077. The buildings consist of a masonry walls, bar joists, wood frame walls and roof, asphalt shingles storefront glazing and typical materials used between the 1920's and 1980's. Asphalt parking lot, site utilities, sidewalks, and miscellaneous site amenities must be removed. Asbestos and universal waste materials to be removed in advance of building/site demolition. Site improvements includes filling lower level/basement areas with clean materials, finish grading, providing for positive drainage, seeding, and maintaining security fencing during demolition. The work requires the Contractor(s) to furnish all labor, material, tools, equipment, utilities, and other services and to comply with applicable laws and requirements, and to obtain all requisite permits and approvals. Bid Result - 99 East Erie Street Proposal A1 - ProQuality Land Development - 79000 Proposal A2 - Eagle Abatment & Demolition - 32375.86 125 East Erie Street Proposal B1 - ProQuality Land Development - 153000 Proposal B2 - Eagle Abatment & Demolition - 30736.31 175 East Erie Street Proposal C1 - Pillar Excavating & Demolition - 75930 Proposal C2 - Eagle Abatment & Demolition - 3401 209 North St. Clair Avenue Proposal D1 - Siegel Excavating - 70000 Proposal D2 - Eagle Abatment & Demolition - 17269.85

Award

Municipal

$592,233.00

Public - County

Demolition, Site Work

13

18

2

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
59
Bidding Soon
898
All Active Projects
292
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

May 27, 2024

img_map_placeholder

E Erie St & N St Clair St, Painesville, OH

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.