BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2024 at 8:00 PM

Updated August 20, 2025

Renovation of an educational facility in Santa Clarita, California. Completed plans call for the renovation of a educational facility.

Valencia High School Auditorium Modernization Project - William S. Hart Union High School District ("District") is seeking informal sealed bids from qualified contractors for construction of the following public-works project. ("Project") Valencia High School Auditorium Modernization Project (VA2405A). the project consists of upkeep maintenance work within existing theater building including cosmetic maintenance work such as repainting, refurbishing, etc., as defined in title 24, part 1, section 4-314 (dsa ir a-22 appendix item 17), replacement of interior floor coverings of like materials (dsa ir a-22 appendix item 18a), and lighting and av upgrade: re-lamping, ballast replacement, fixture replacement (dsa ir a-22 appendix item 29).without work on structural framing or replacement of large mechanical, electrical, or plumbing units or systems. project is exempt from dsa review per title 24, part 1, section 4-315 (dsa ir a-22, 1.3.1) The award of the Contract will be based on the following method of determining the lowest bid: lowest responsive bid. District issues Notice of Award: 6/06/2024 Contractor commences Work: 6/24/2024 Contractor completes Work: Substantial Completion date: 12/24/2024. Final Project Completion date: 1/24/2025 The Successful Bidder must complete the Work in accordance with the Contract Documents and within the time period specified in the Special Provisions and the Master Construction Schedule as adjusted in accordance with the Contract Documents. The failure of such bidder to fully complete the Work within such time period(s) may result in the District assessing liquidated damages against the bidder as provided in the General Provisions. Question Deadline 05/01/2024 at 2:00 PM PT Last Day for Pre-Bid RFI - project related questions shall be submitted via the District's eProcurement Portal Q&A feature. As described in the General Provisions, the successful bidder must provide a Performance Bond and a separate Payment Bond, each in an amount equal to 100% of the total Contract Price, and each issued by a California-admitted surety as defined in Code of Civil Procedure Section 995.120. Each bid must be submitted with security in an amount equal to 10% of the maximum bid, It is understood that the Owner reserves the right to reject this bid and that this bid shall remain open and not be withdrawn for the period specified in the Notice Inviting Bids

Award

Educational

$1,320,000.00

Public - City

Renovation

41

25

2

6

Subscribe For Documents

88 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
617
Active Projects
288
Bidding Soon
3,299
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

June 24, 2024

Project location map

27801 Dickason Dr, Santa Clarita, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.