BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Fayetteville, Arkansas. Completed plans call for site work for a municipal facility.

Washington County Animal Shelter is Seeking Bids for K9 Grass Classic to Cover 12 Outdoor Kennels, Approx. 3,872 Sq. Ft. Requirement: Bidders Must Comply With the Following Requirements to Be Considered for the Evaluation and Award Process: 1. Bidders Must Quote 100% of All Items Within Each Category; and 2. Bidders Must List Brand Names on the Items Bid. Information: for Additional Information, Email Purchasing@washingtoncountyar.gov. Bidders Shall Direct Bid Inquiries to the Washington County Purchasing Office. For Evaluation Purposes We Request That You Submit One (1) Original and Four (4) Copies of Your Bid in a Sealed Envelope Labeled "Bid 2024-09 K9 Grass for Animal Shelter It is Solely and Strictly the Responsibility of the Bidder to Ensure That the Bid is Received by the Washington County Purchasing Division on or Before the Specified Date and Time. Washington County Animal Shelter is seeking bids for Installation of K9 Grass Classic + or similar to cover 12 outdoor kennels approx. 3,872 sq ft. PRODUCTS A. Synthetic grass: ForeverLawn K9Grass Classic + Pile Weight: 65 oz./sy. Face Yarn Type: Primary: Polyethylene; Secondary: Heatset textured nylon monofilament containing antimicrobial agent Yarn Count: Primary 5,000/4; Secondary: 4,200/8 Pile Height (knitted): 7/8" (+/- 1/8). Color: Primary: Summer Green; Secondary: Turf green Construction: Knitted Antimicrobial Protection: AlphaSan (manufactured into yarn) Tufting Gauge: N/A - knitted product Backing: Flow-through knitted backing Seaming: Turf adhesive Total Product Weight: 70 oz./sy. Finished Roll Width: 15 ft. (4.6 m) Finished Roll Length: Up to 150 ft. (45.72 m) I. The synthetic grass shall be delivered in 15-foot-wide rolls. The rolls will be laid out and installed as specified in the site layout and equipment placement drawings. II. All seams shall be installed and secured with approved turf adhesive. Seams secured with stitching alone shall not be acceptable. III. No infill material is to be used. B. Base and Attaching Components: Base is to be prepared using plastic "2x4" or"2x2" plastic board and secured using 1" length 1/4" crown stainless steel staples. Turf is to be secured around all edges. DESCRIPTION OF WORK The contractor shall provide all labor, materials, equipment, and tools necessary for the complete installation of a "no infill" synthetic grass dog surface with a stable draining base. The complete synthetic grass system shall consist of, but not necessarily be limited to the following: A. Area of construction with the extent of artificial turf work as shown on the drawings. B. Subgrade, base, and drainage construction as specified in Section 2 and Section 3 of this document. C. Quality synthetic grass product manufactured in the USA according to specifications in Section 2 of this document. Product shall be a knitted synthetic grass product (not tufted) and contain an antimicrobial agent while meeting or exceeding all guidelines as established herein. For characteristics not specifically stated, they shall meet or exceed all guidelines published by the Synthetic Turf Council. D. The synthetic grass surface shall be specifically designed, manufactured, and installed for the intended use as a commercial/high use dog surfacing solution. E. Plastic perimeter boards ("2x4" or "2x2" set vertically) are to surround the entire area for anchoring of the turf. The top edge of this surface is to be a minimum of 1/2" below any adjacent solid walking surfaces where there could be foot traffic. F. Stainless steel staples, 1" in length, are to be used to anchor the synthetic turf to the perimeter boards. CLEAN UP A. Contractor shall provide the labor, supplies, and equipment as necessary for final cleaning of surfaces and installed items. B. During the contract and at intervals as directed by the owner or owner's representative and as synthetic grass system installation is completed, clear the site of all extraneous materials, rubbish, or debris, and leave the site in a clean, safe, well-draining, neat condition. C. Surfaces, recesses, enclosures, etc. shall be cleaned as necessary to leave the work area in a clean, immaculate condition ready for immediate occupancy and use by the owner. BID requests for interpretations to be submitted by 2:00PM on Thursday, April 18, 2024. Written requested maybe emailed to purchasing@washingtoncountyar.gov. Oral instructions or explanations will not be binding. Only written addenda shall be binding. Any addenda resulting from these requests for clarification will be faxed or delivered to all listed holders of the bid document and posted on the County web-site. Bidders shall acknowledge the receipt of all addenda. Any addenda or bulletins issued during the time of bidding shall become part of the documents provided to bidders for the preparation of their bids. Any such addenda or bulletins shall be covered in the bid, and shall be made part of the resulting agreement.

Award

Municipal

$56,178.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
50
Bidding Soon
528
All Active Projects
232
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2024

May 29, 2024

img_map_placeholder

To Be Determined, Fayetteville, AR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.