BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Norwich, New York. Completed plans call for site work for a water / sewer project.

As of June 12, 2024, project was awarded to Kelly Asphalt Maintenance, awarded amount is $72,465.65. This specification covers the repair of sludge drying beds at the City of Norwich WWTP located at 129 Portelli Drive. The City would like to repair 5 out of the 15 drying beds. We plan on repairing beds numbered 4, 5, 7, 8, and 9, subject to change. Each bed is a 50ft by 50ft area, covered with 4 inches deep of asphalt. Drainage stone, 3 feet deep, lies below the asphalt used as the base. The top of the finished asphalt layer lies 15" below the top of the concrete walls surrounding each bed. Interested Contractors are welcome to come visit the sludge drying beds anytime between 7am and 3pm M-F at the WWTP if interested. Any questions contact Ed Pepe, 607-334-1255, or edwardpepe@norwichnewyork.net. In general, the Contractor shall remove all existing asphalt, regrade stone surface and fill in low spots as necessary to make flat and ready for new asphalt, and then add 4 inches of new binder asphalt per the attached specification. Stone will be paid for on a unit price basis. New asphalt cost will be labor only. The contractor is responsible for selecting the asphalt supplier, setting up delivery, and managing all aspects of the asphalt delivery and placement, but the asphalt material cost will be billed direct to the City by the plant. The Contractor shall carry the cost of the asphalt material cost in the bid to be paid direct to the asphalt supplier. Minority Owned Sub-Contracting Goal: 0% Women Owned Sub-Contracting Goal: 0% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Disadvantaged Owned Sub-Contracting Goal: 0% Contract term: NA Bid Security - Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a bid security (i.e. certified check, bank check, or bid bond in the amount of 5% of the total bid). CONTRACT PERIOD: All beds shall be repaired no later than July 26th 2024, unless an approved extension is provided by the City. Any questions contact Ed Pepe, 607-334-1255, or edwardpepe@norwichnewyork.net.

Award

Water / Sewer

$72,466.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
69
Bidding Soon
849
All Active Projects
451
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

June 21, 2024

img_map_placeholder

129 Portelli Dr, Norwich, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.