Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 25, 2025 at 8:00 PM

Updated September 26, 2025

Site work for a playground / park / athletic field in Berea, Kentucky. Completed plans call for site work for a playground / park / athletic field.

As of September 25, 2025, this project has been completed. The city is requesting a proposal for the replacement of the asphalt basketball court which will include the labor and material for the following: 1. Removal of the existing asphalt basketball court (approximately 106' x 70') 2. The existing basketball goals shall remain in place. 3. Compaction of the existing crushed stone aggregate and verification that the depth of the stone is a minimum of 4" in all areas. Add crushed stone as needed to meet 4" minimum. 4. Installation of 2" minimum of asphalt base coat and 1.25" minimum of asphalt surface coat, maintaining 10' from the top of the surface coat to the top of the rim on the basketball goal. 5. The asphalt shall be crowned to promote drainage and shall have no puddles of standing water deeper than .25" one-hour after rainfall. 6. Any damage to the adjacent walking trail, lawn, or any city owned property shall be repaired upon completion of the paving. 7. The area of work shall be contained within temporary fencing or barriers during construction

Occupancy

Playgrounds / Parks / Athletic Fields

$104,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
50
Bidding Soon
1,237
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

December 16, 2024

Project location map

6 Pirate Pkwy, Berea, KY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed